摘要:
The present invention relates to an industrialized construction process of at least part of a structure (1) to be constructed, by applying it, for example, to bridge decks, in which the filling material (8) is poured in situ on empty segments (3) prefabricated ex situ. The construction process according to the present invention comprises the prefabrication of empty segments (3) including the assembling of steel reinforcement elements (9) and assembling fixing elements (4) whereby these comprise rigid elements (22) and at least part of the moulds (13), which occur at a location (5) ex situ, for example at the factory, construction site or at a place close to the works front line; transport and placement of the empty segments (3) in the final position in the structure (1); the operation of pouring the filling material (8); consolidation or curing of the filling material; prestressing the structure (1), if applicable; removal of the moulds (13) and fixing elements (4); followed by the start of the next cycle, if applicable. The present invention also relates to a construction system adapted for carrying out a construction process of a structure (1) to be constructed.