SYSTEM UND VERFAHREN ZUR ANALYSE EINES FERTIGUNGSPROZESSES
    1.
    发明公开
    SYSTEM UND VERFAHREN ZUR ANALYSE EINES FERTIGUNGSPROZESSES 有权
    系统和方法分析制造工艺

    公开(公告)号:EP1989601A1

    公开(公告)日:2008-11-12

    申请号:EP06805455.0

    申请日:2006-10-20

    IPC分类号: G05B19/418

    摘要: The invention relates to a system and a method for analysing a production process. In order to make it possible to analyse the production process in an improved manner for the purpose of production planning, the invention proposes a method for analysing a production process in which at least one production device (3) that is controlled by a control program is involved, wherein the method has the following method steps: at least one part (10) of the control program (1) is simulated using a simulation program (18) and instructions (100) which are executed in this case are logged, and an associated data record (21), in which the real-time requirement of an action caused by the logged instruction (100) on the production device (3) is respectively assigned to the logged instructions (100), is generated.

    SYSTEM UND VERFAHREN ZUR ANALYSE EINES FERTIGUNGSPROZESSES
    7.
    发明授权
    SYSTEM UND VERFAHREN ZUR ANALYSE EINES FERTIGUNGSPROZESSES 有权
    系统和方法分析制造工艺

    公开(公告)号:EP1989601B1

    公开(公告)日:2010-11-24

    申请号:EP06805455.0

    申请日:2006-10-20

    IPC分类号: G05B19/418

    摘要: The invention relates to a system and a method for analysing a production process. In order to make it possible to analyse the production process in an improved manner for the purpose of production planning, the invention proposes a method for analysing a production process in which at least one production device (3) that is controlled by a control program is involved, wherein the method has the following method steps: at least one part (10) of the control program (1) is simulated using a simulation program (18) and instructions (100) which are executed in this case are logged, and an associated data record (21), in which the real-time requirement of an action caused by the logged instruction (100) on the production device (3) is respectively assigned to the logged instructions (100), is generated.