摘要:
A pipe-laying vessel (1) is provided, including a tower (2) extending upwardly from the vessel, a pipe loading arm (9) for raising a length of pipe from the deck to a position aligned with the tower, a travelling clamp assembly (30) mounted for movement along the tower. The travelling clamp assembly (30) includes both a line-up clamp (33) and a pipeline tension bearing clamp (34).
摘要:
Pipe-laying Vessel and Method of Laying a Pipeline A pipe-laying vessel (100) including pipe-laying apparatus for S-laying a pipeline from the vessel, wherein the vessel further includes a pipe-laying tower (300) for J-laying a pipeline from the vessel, the pipe-laying tower (300) being positioned partway along the length of the vessel between the upstream and downstream portions of the S-lay pipe-laying path.
摘要:
A method of laying conduit at sea from a reel vessel includes the steps of laying conduit, for example pipeline or umbilical, from a first reel which rotates about a first substantially vertical axis. Conduit is laid from a second reel of conduit rotating about a second substantially vertical axis spaced apart from the first axis. A portion of the route travelled by the conduit during the step of laying conduit from the first reel of conduit is substantially the same as a portion of the route travelled by the conduit during the step of laying conduit from the second reel of conduit, for example, the conduit from the second reel may pass around a part of the periphery of the first reel and then follow substantially the same path as previously travelled by the conduit laid from the first reel.
摘要:
A pipe-laying vessel including a pipe-laying tower extending upwardly from the vessel, the tower including a first lower section extending upwardly from a proximal end to a distal end above the main deck of the vessel, and a second upper section movably mounted on the first lower section, and the tower having a first pipe-laying configuration for laying pipeline P in which the upper section is positioned above the lower section and pipe is passed from the upper section to the lower section when, in use, it is being laid, and a second stowed configuration in which the second upper section is moved relative to the lower section and the overall height of the tower is reduced.
摘要:
A pipe-laying vessel including a pipe-laying tower extending upwardly from the vessel, the vessel including a welding station for joining a new pipestring to an end of the pipeline held by the tower, a clamp assembly on the tower for engaging a pipestring with a lower end adjacent to the end of the pipeline held by the tower and with the pipestring extending upwardly from its lower end alongside the tower, wherein the clamp assembly includes a pipestring clamp that serves both the function of a transfer clamp for transferring the pipestring from a position alongside the tower but displaced from the pipe-laying path to a position approximately aligned with the pipe-laying path, and the function of a line-up clamp for lining up the pipestring with the end of the pipeline.
摘要:
A pipe-laying vessel (1) is provided, including a tower (2) extending upwardly from the vessel, a pipe loading arm (9) for raising a length of pipe from the deck to a position aligned with the tower, a travelling clamp assembly (30) mounted for movement along the tower. The travelling clamp assembly (30) includes both a line-up clamp (33) and a pipeline tension bearing clamp (34).