摘要:
A method of cementing a tubular string in a wellbore includes: deploying the tubular string into the wellbore; pumping cement slurry into the tubular string; launching a cementing plug after pumping the cement slurry; propelling the cementing plug through the tubular string, thereby pumping the cement slurry through the tubular string and into an annulus formed between the tubular string and the wellbore; and controlling flow of fluid displaced from the wellbore by the cement slurry to control pressure of the annulus.
摘要:
A method of managing drilling pressures, comprising: measuring a flow rate of a drilling fluid injected into a tubular string extending into a subsea wellbore in a formation; measuring a flow rate of returns from a drill bit disposed on a bottom of the tubular string; comparing the returns flow rate to the drilling fluid flow rate to detect a kick; exerting backpressure on the returns using a first variable choke valve. The method further comprises, in response to detecting the kick: closing a blowout preventer of a subsea pressure control assembly (PCA) against the tubular string; and diverting the flow of returns from the PCA, through a choke line having a second variable choke valve, and through the first variable choke valve.
摘要:
A method of cementing a tubular string in a wellbore includes: deploying the tubular string into the wellbore; pumping cement slurry into the tubular string; launching a cementing plug after pumping the cement slurry; propelling the cementing plug through the tubular string, thereby pumping the cement slurry through the tubular string and into an annulus formed between the tubular string and the wellbore; and controlling flow of fluid displaced from the wellbore by the cement slurry to control pressure of the annulus.
摘要:
A method of drilling a subsea wellbore includes drilling the subsea wellbore and, while drilling the subsea wellbore: measuring a flow rate of the drilling fluid injected into a tubular string; measuring a flow rate of returns; comparing the returns flow rate to the drilling fluid flow rate to detect a kick by a formation being drilled; and exerting backpressure on the returns using a first variable choke valve. The method further includes, in response to detecting the kick: closing a blowout preventer of a subsea pressure control assembly (PCA) against the tubular string; and diverting the flow of returns from the PCA, through a choke line having a second variable choke valve, and through the first variable choke valve.