CONSTRUCTION METHOD FOR FIXING HOLLOW COLUMN FOR SUPPORTING MARINE STRUCTURES AND OFFSHORE PLATFORMS TO A SEABED
    1.
    发明公开
    CONSTRUCTION METHOD FOR FIXING HOLLOW COLUMN FOR SUPPORTING MARINE STRUCTURES AND OFFSHORE PLATFORMS TO A SEABED 审中-公开
    施工方法用于固定空心柱体海上建筑物及海上平台上的海底磨损

    公开(公告)号:EP3094788A1

    公开(公告)日:2016-11-23

    申请号:EP15737412.5

    申请日:2015-01-14

    发明人: WONG, Carlos

    IPC分类号: E02D27/14 E02D27/52

    摘要: A construction method for fixing a foundation of a waterborne structure including an offshore platform to a seabed (2) is described. The foundation includes at least one hollow column (108) which incorporates a pile cap (43) at its bottom. In the method, piles (49) are driven into the seabed (2) to a design depth, and the hollow column (108) is then lowered to the seabed (2) so as to surround the pile group and be supported thereby. Concrete is cast into the bottom of the hollow column (108), wherein reinforcement steel bar(45) has been pre-installed to translate the conventional mass concrete plug into a reinforced concrete small pile cap (43) adapted to support the hollow column (108) thereon during construction. The hollow column (108) is de-watered, excessive pile length is cut, and pile cap reinforcement (47) is fixed followed by concrete casting of the pile cap (44). A platform deck is then installed and constructed on top of the now-fixed hollow column (108).

    HOLLOW CYLINDRICAL PIER FOR FIXING OFFSHORE PLATFORM STRUCTURE TO BED AND METHOD OF INSTALLING AND CONSTRUCTING SAME
    2.
    发明公开
    HOLLOW CYLINDRICAL PIER FOR FIXING OFFSHORE PLATFORM STRUCTURE TO BED AND METHOD OF INSTALLING AND CONSTRUCTING SAME 审中-公开
    中空的圆柱形支柱用于固定的海上平台建设上安装施工IT的海床和方法

    公开(公告)号:EP3118374A1

    公开(公告)日:2017-01-18

    申请号:EP15762413.1

    申请日:2015-03-11

    发明人: WONG, Carlos

    IPC分类号: E02B17/00

    摘要: Provided is a method of installing and constructing a hollow cylindrical pier for fixing an offshore platform structure to the bed, wherein a steel cylinder (101) with an inner diameter slightly greater than the hollow cylindrical pier is driven into the bed (2) until at least the bearing stratum is reached to ensure fixing, and part of the steel cylinder (101) is exposed above the water surface (1); draining ponding inside the steel cylinder (101), and excavating bed sediment inside the steel cylinder (101); cutting off the steel cylinder (101); hoisting a first hollow cylindrical pier section (1A) with a sealed bottom end vertically downwards from the water surface (1) towards the steel cylinder (101), pre-tensioning an overlapping hollow cylindrical pier section on the hollow cylindrical pier section via a shear key structure and then fixedly connecting same with the previous hollow cylindrical pier section, and hoisting same in turn such that after the sealed bottom end of the first hollow cylindrical pier section (1A) reaches near the bottom end of steel cylinder (101), at least part of the lastly hoisted overlapping hollow cylindrical pier section is exposed above the water surface (1); and pouring concrete (107) into a gap between the steel cylinder (101) and the hollow cylindrical piers. Further provided are a method of installing and constructing an offshore platform structure and a hollow cylindrical pier for fixing to the bed and an offshore platform structure.

    摘要翻译: 本发明提供一种安装和构建用于海上平台结构的固定到床的中空圆柱形墩,worin钢筒(101),其具有内径大于中空圆柱形墩稍大被驱动进入所述床的方法(2),直到在 在达到至少持力层,以确保固定,和钢筒的部分(101)设置在水面以上(1)露出; 排出积水钢筒(101)内,并且挖掘钢筒(101)的内部床沉积物; 切断钢筒(101); 从水面吊装具有密封的底部端的第一中空圆柱形墩部(1A)垂直向下(1)朝向所述钢筒(101),经由剪切中空圆柱形墩部重叠中空圆柱形墩部的预张紧 在键结构体,然后固定连接相同与前一中空圆柱形墩部,和吊装反过来相同检查没有后的第一个中空圆柱形墩部(1A)的密封底端达到接近钢瓶的底端(101) 的最后悬挂重叠中空圆柱形墩部的至少一部分被所述水面(1)的上方露出; 与浇筑混凝土(107)到钢筒(101)和中空圆柱形墩之间的间隙。 进一步提供的是在安装和海上平台结构以及用于固定到床和海上平台结构的中空圆柱形墩构造的方法。