Method of constructing a well
    2.
    发明公开
    Method of constructing a well 失效
    构建孔的方法

    公开(公告)号:EP0852282A3

    公开(公告)日:1999-10-20

    申请号:EP98300014.2

    申请日:1998-01-02

    IPC分类号: E21B7/00 E21B33/14

    CPC分类号: E21B7/00 E21B29/00 E21D1/00

    摘要: The destruction of a well as a result of the movement of a subsiding subterranean rock formation (24) penetrated by the well bore (22) is delayed by constructing the well with a slot (28, 34, 36) cut into the subterranean formation in a direction opposite the direction (26) of movement of the formation towards the well bore, whereby the well bore extends through the slot as the subterranean formation moves.

    METHOD OF CONSTRUCTING UNDERGROUND GALLERY BY USING PNEUMATIC TRANSFER SYSTEM, AND STRATUM DISPOSAL METHOD
    3.
    发明公开
    METHOD OF CONSTRUCTING UNDERGROUND GALLERY BY USING PNEUMATIC TRANSFER SYSTEM, AND STRATUM DISPOSAL METHOD 审中-公开
    用于生产地下画廊通过使用气动传输系统以及中层处置程序

    公开(公告)号:EP1443177A1

    公开(公告)日:2004-08-04

    申请号:EP02775513.1

    申请日:2002-11-08

    IPC分类号: E21D9/12 G21F9/34 G21F9/36

    摘要: A method of constructing underground galleries using a pneumatic transfer system and a stratum disposal method are provided, wherein in constructing a disposal gallery of a stratum disposal site and tunnels such as mountain tunnels or in performing stratum disposal of waste matter, the carrying-out of excavation chips or the like, the carrying-in of materials and equipment or the like and the carrying-in and positioning of waste matter may be effected safely, quickly and reliably at low cost, and the buffer material quality for waste matter may be secured. In construction, an air carrying pipeline (10) is used while extending the air carrying pipeline (10) downward as desired during excavation of a vertical shaft (2) so as to carry out vertical shaft excavation chips (a) to the ground and carry in materials and equipment including vertical shaft spray concrete (b) to the underground site. Alternatively, the vertical shaft itself is used as the air carrying pipeline (10), and by using the air carrying pipeline (10) extending from the vertical shaft (2a) to an underground gallery (3), excavation chips (a) from the underground gallery (3) are carried out to the ground and materials and equipment for the underground gallery are carried in to the underground site. In operation, the air carrying pipeline (10) is used to carry in a carrying container (11) with the waste matter (A) and a buffer material (13) integrated together and stored therein, to the underground site, and the integrated waste matter (A) and buffer material (B) are positioned and buried in a disposal hole (7).

    Verfahren zum Abbau von Böden
    5.
    发明公开
    Verfahren zum Abbau von Böden 有权
    Verfahren zum Abbau vonBöden

    公开(公告)号:EP1555388A1

    公开(公告)日:2005-07-20

    申请号:EP04000964.9

    申请日:2004-01-19

    发明人: Müller, Wolfgang

    IPC分类号: E21D1/00 E21D9/10 E21B44/00

    摘要: Verfahren zum Abbau von Böden, wobei eine um ihre Längsachse rotierende Aufdüslanze (5) bis zu einem Bohransatzpunkt (17) vorgetrieben wird und wobei mit der Aufdüslanze (5) ein fluides Medium unter hohem Druck in den Boden eingedüst wird. Das aufgelockerte Erdreich wird abgefördert und die Aufdüslanze (5) wird unter Bildung eines Aufdüsraumes aus dem Boden gezogen. Die Ausdehnung des Aufdüsraumes wird ermittelt. In Abhängigkeit von dieser Ausdehnung wird ein Raster von Bohransatzpunkten mit der Maßgabe festgelegt, dass benachbarte Aufdüsräume aneinander angrenzen oder einander überlappen. Die Bohransatzpunkte (17) des Rasters werden nacheinander automatisch von der Aufdüslanze angefahren.

    摘要翻译: 该方法包括拆除土壤,例如稳定的土壤,其中定义的钻井起点围绕纵向轴线旋转并向前推入土壤(6)。 流体(5)在高压下松开可以释放和拉出的土壤。 定义钻井起点,表明土壤被拆除的起点。

    VERFAHREN UND VORRICHTUNG ZUM EINBRINGEN ODER ABTEUFEN VON HOHLRÄUMEN IM GEBIRGE
    6.
    发明公开
    VERFAHREN UND VORRICHTUNG ZUM EINBRINGEN ODER ABTEUFEN VON HOHLRÄUMEN IM GEBIRGE 有权
    方法和装置山中引入或下沉孔洞

    公开(公告)号:EP2825715A2

    公开(公告)日:2015-01-21

    申请号:EP13714200.6

    申请日:2013-03-15

    IPC分类号: E21B7/15

    摘要: The invention relates to a method for sinking or introducing cavities in rock, wherein the face of the cavity (2) is melted using electrical plasma generators. In order in such a method to produce an energy density at the face of the cavity (2), said energy density being sufficient to completely or partially evaporate the in-situ stone, the invention proposes arranging a heat shield (4) immediately over the face of the cavity (2), said heat shield (4) forming with the face of the cavity (2) a dynamic pressure space (7) in which a temperature of more than 2000°C is established at a pressure of more than 2 bar by heating with plasma generators (8). This supply of energy is sufficient to melt the stone in-situ at the face of the cavity (2), to completely or partially gasify it and to remove it from the cavity (2).

    METHOD OF CONSTRUCTING UNDERGROUND GALLERY BY USING PNEUMATIC TRANSFER SYSTEM, AND STRATUM DISPOSAL METHOD
    7.
    发明公开
    METHOD OF CONSTRUCTING UNDERGROUND GALLERY BY USING PNEUMATIC TRANSFER SYSTEM, AND STRATUM DISPOSAL METHOD 审中-公开
    用于生产地下画廊通过使用气动传输系统以及中层处置程序

    公开(公告)号:EP1443177A4

    公开(公告)日:2005-04-13

    申请号:EP02775513

    申请日:2002-11-08

    申请人: KAJIMA CORP

    摘要: A method of constructing underground galleries using a pneumatic transfer system and a stratum disposal method are provided, wherein in constructing disposal galleries, mountain tunnels or the like in a stratum disposal site or in performing stratum disposal of waste matter, the carrying-out of excavation chips or the like and carrying-in of materials and equipment or the like and the carrying-in and positioning of waste matter can be effected safely, quickly and reliably at low cost, and the quality of buffer material for waste matter can be secured. In construction, an air carrying pipeline 10 is used while extending the air carrying pipeline 10 downward as desired during the excavation of a vertical shaft 2a so as to carry out vertical shaft excavation chips a to the ground and carry in materials and equipment including vertical shaft spray concrete b to the underground site. Alternatively, the vertical shaft itself is used as the air carrying pipeline 10, and by using the air carrying pipeline 10 extending from the vertical shaft 2a to an underground gallery 3, excavation chips a from the underground gallery 3 are carried out to the ground and materials and equipment for the underground gallery are carried in to the underground site. In operation, the air carrying pipeline 10 is used to carry in a carrying container 11 having the waste matter A and a buffer material B, which are integrated together, stored therein, to the underground side, and the integrated waste matter A and buffer material B are positioned and buried in a disposal hole 7.

    摘要翻译: 提供构建使用气动传输系统和地层处置方法地下画廊的方法,worin在构造地层处置场和隧道的处置画廊:如山隧道或在执行地层处置的废物,搬出的 挖掘芯片或类似物,所述的材料和设备或类似物并搬入和废物定位搬入可以安全地进行,快速而可靠地以低成本,以及用于废物物质的缓冲材料的质量可被固定 , 在施工中,在空气中携带管道(10),而扩展携带管道(10)的空气被用于向下的垂直轴(2)的挖掘过程中如所希望的,以便进行垂直轴挖掘碎片(a)到地面,并携带 在材料和设备,包括垂直轴喷雾混凝土(b)向所述地下部位。 可替代地,垂直轴本身被用作空气承载管道(10),并且通过使用带有管道(10)从垂直轴(2a)的延伸到空气中,在地下廊(3)中,从挖掘碎片(a) 地下画廊(3)都进行了地面,材料和设备的地下画廊地下网站都进行。 在手术中,空气承载管道(10)被用于在搬运容器(11)与所述废物物质(A)和缓冲材料(13)来进行集成在一起及所存,向地下部位以及综合废物 物(A)和缓冲材料(B)被定位和埋在废弃孔(7)。

    Method of constructing a well
    8.
    发明公开
    Method of constructing a well 失效
    Verfahren zum Bau eines Lochs

    公开(公告)号:EP0852282A2

    公开(公告)日:1998-07-08

    申请号:EP98300014.2

    申请日:1998-01-02

    IPC分类号: E21B7/00 E21B33/14

    CPC分类号: E21B7/00 E21B29/00 E21D1/00

    摘要: The destruction of a well as a result of the movement of a subsiding subterranean rock formation (24) penetrated by the well bore (22) is delayed by constructing the well with a slot (28, 34, 36) cut into the subterranean formation in a direction opposite the direction (26) of movement of the formation towards the well bore, whereby the well bore extends through the slot as the subterranean formation moves.

    摘要翻译: 由于穿过井眼(22)的沉积的地下岩层(24)的移动导致的井的破坏通过用切入地下地层的槽(28,34,36)构造井而被延迟 与地层朝向井眼的运动方向(26)相反的方向,由此当地层移动时,井眼延伸穿过狭槽。