MODULAR SUPPORT STRUCTURE
    5.
    发明公开

    公开(公告)号:EP3741957A1

    公开(公告)日:2020-11-25

    申请号:EP18901499.6

    申请日:2018-01-17

    申请人: Petrucco S.A.

    IPC分类号: E21D9/00 E01B2/00

    摘要: A modular supporting structure for dismountably supporting a section of railway track (12) while work is in progress below the tracks; comprising at least one adjusting assembly (18) configured so that it can be disassembled from bracing rails (16, 161, 162), which assembly comprises a first adjustable rod cylinder (32) disposed crosswise to bracing rails (161, 162) and a second adjustable rod cylinder (33) and a third adjustable rod cylinder (34) to adjust the height of modular supporting structure (11) to the plane of the running surface in the working position of modular supporting structure (11).

    METHOD FOR WATERPROOFING RAILWAY BRIDGES AND WATERPROOFING MATERIAL FOR CARRYING OUT SAID METHOD
    8.
    发明公开
    METHOD FOR WATERPROOFING RAILWAY BRIDGES AND WATERPROOFING MATERIAL FOR CARRYING OUT SAID METHOD 审中-公开
    方法WASSERDICHTMACHUNG铁路桥,防水材料用于执行该方法

    公开(公告)号:EP3099859A1

    公开(公告)日:2016-12-07

    申请号:EP15708302.3

    申请日:2015-01-28

    IPC分类号: E01D19/08 E01B2/00 E01B19/00

    摘要: A method for waterproofing of bridges (1) and similar structures aimed at railway traffic is described, the structures comprising an arch or deck structure, on which there is placed a ballast (M) of gravel or crushed stone (2) upon which the tracks (6) extend between the two ends of the bridge (1). The waterproofing is obtained first by the removal of the tracks (6) and a reduced layer (S) of gravel or crushed stone (2), leaving in place the remaining part of gravel or crushed stone (2), and then by laying one or more sheets (10) of cured rubber on the remaining part of gravel or crushed stone (2). The thickness of the rubber is such as to be sufficiently resistant to perforation by the gravel or crushed stone (2), which is subsequently placed thereon to complete the ballast, Finally, the previously removed tracks (6) are set in place again. According to the method, a joint is made between the sheets (10) by means of a connection of mechanical type, with a positive locking shape fit, or a chemical bond using a suitable adhesive.

    ÜBERGANGSKONSTRUKTION UND EISENBAHNBRÜCKE MIT EINER SOLCHEN ÜBERGANGSKONSTRUKTION
    10.
    发明公开
    ÜBERGANGSKONSTRUKTION UND EISENBAHNBRÜCKE MIT EINER SOLCHEN ÜBERGANGSKONSTRUKTION 审中-公开
    过渡性建设及铁路桥这样的过渡性建筑

    公开(公告)号:EP2978897A1

    公开(公告)日:2016-02-03

    申请号:EP14713471.2

    申请日:2014-03-28

    发明人: BRAUN, Christian

    IPC分类号: E01B2/00 E01D19/06

    CPC分类号: E01B2/003 E01D19/062

    摘要: The present invention relates to a junction structure (1) for supporting at least one rail (2) in the region of a joint (3) of a railway bridge (4) and a railway bridge (4) which is constructed with such a junction structure (1). The latter has at least two displaceably mounted cross beams (5, 6, 7), at least one joint sleeper (8) which is attached to the cross beams (5, 6, 7) and has the purpose of supporting the at least one rail (2) in the region of the joint (3), and at least one control device (14) for orienting the position of the joint sleeper (8) in the junction structure (1), wherein the at least one joint sleeper (8) has a rail attachment (13) with which the joint sleeper (8) can be displaceably attached to the rail (2). According to the invention, the cross beams (5, 6, 7) and the control device (14) are arranged underneath the at least one joint sleeper (8).