Digging Method and Assembly for Laying a Pipeline in the Bed of a Body of Water
    1.
    发明申请
    Digging Method and Assembly for Laying a Pipeline in the Bed of a Body of Water 有权
    在水体床上放置管道的挖掘方法和装配

    公开(公告)号:US20120288334A1

    公开(公告)日:2012-11-15

    申请号:US13510880

    申请日:2010-11-10

    CPC classification number: E02F5/104 B63B35/03 E02F5/145

    Abstract: A method of laying a pipeline in the bed of a body of water advancing a digging assembly along a pipeline laid along a path on the bed of the body of water, and digging a trench along the path in the bed of the body of water by means of the digging assembly, so a portion of pipeline settles onto the bottom of the trench: The method also includes acquiring, by means of the digging assembly, data related to the bathymetric profile of the portion of pipeline laid on the bottom of the trench, and comparing the acquired data with a set of permissible values. Further, the method includes emitting an error signal when the acquired data does not fall within the set of permissible values.

    Abstract translation: 一种将管道铺设在水体床上的方法,沿着沿着水体床上的路径铺设的管道推进挖掘组件,并且沿着水体的床中的路径挖掘沟槽的方法, 挖掘组件的装置,因此管道的一部分沉降到沟槽的底部上。该方法还包括通过挖掘组件获取与铺设在沟槽底部上的管道部分的测深轮廓相关的数据 ,并将获取的数据与一组允许值进行比较。 此外,该方法包括当所获取的数据不在容许值的集合内时发出错误信号。

    Method and system for laying a pipeline on the bed of a body of water
    2.
    发明授权
    Method and system for laying a pipeline on the bed of a body of water 有权
    将管道铺设在水体床上的方法和系统

    公开(公告)号:US08985905B2

    公开(公告)日:2015-03-24

    申请号:US14009468

    申请日:2012-04-06

    Abstract: A method of laying a pipeline on the bed of a body of water includes constructing, on a laying vessel, a pipeline having pipe sections of a designated or given thickness, and thicker pipe sections distributed along the pipeline; moving the laying vessel forward and laying the pipeline in the body of water as the pipeline is constructed; and propelling a train, configured to plug the pipeline, in steps inside the pipeline laid on the bed of the body of water; the step travel of the train being related to the position of the thicker pipe sections, and to the touchdown point of the pipeline on the bed of the body of water.

    Abstract translation: 将管道铺设在水体床上的方法包括在铺设船上建造具有指定或给定厚度的管段的管道以及沿管道分布的较厚的管段; 将铺设船向前移动,将管道铺设在管道的水体中; 并推动列车,配置为堵塞管道,在铺设在水体床上的管道内的步骤内; 火车的步行行程与较厚的管段的位置相关,并与水体床上的管道的着陆点相关。

    Digging method and assembly for laying a pipeline in the bed of a body of water

    公开(公告)号:US10240320B2

    公开(公告)日:2019-03-26

    申请号:US13510880

    申请日:2010-11-18

    Abstract: A method of laying a pipeline in the bed of a body of water advancing a digging assembly along a pipeline laid along a path on the bed of the body of water, and digging a trench along the path in the bed of the body of water by means of the digging assembly, so a portion of pipeline settles onto the bottom of the trench. The method also includes acquiring, by means of the digging assembly, data related to the bathymetric profile of the portion of pipeline laid on the bottom of the trench, and comparing the acquired data with a set of permissible values. Further, the method includes emitting an error signal when the acquired data does not fall within the set of permissible values.

    METHOD AND SYSTEM FOR LAYING A PIPELINE ON THE BED OF A BODY OF WATER
    4.
    发明申请
    METHOD AND SYSTEM FOR LAYING A PIPELINE ON THE BED OF A BODY OF WATER 有权
    在水体上铺设管道的方法和系统

    公开(公告)号:US20140126962A1

    公开(公告)日:2014-05-08

    申请号:US14009468

    申请日:2012-04-06

    Abstract: A method of laying a pipeline on the bed of a body of water includes constructing, on a laying vessel, a pipeline having pipe sections of a designated or given thickness, and thicker pipe sections distributed along the pipeline; moving the laying vessel forward and laying the pipeline in the body of water as the pipeline is constructed; and propelling a train, configured to plug the pipeline, in steps inside the pipeline laid on the bed of the body of water; the step travel of the train being related to the position of the thicker pipe sections, and to the touchdown point of the pipeline on the bed of the body of water.

    Abstract translation: 将管道铺设在水体床上的方法包括在铺设船上建造具有指定或给定厚度的管段的管道以及沿管道分布的较厚的管段; 将铺设船向前移动,将管道铺设在管道的水体中; 并推动列车,配置为堵塞管道,在铺设在水体床上的管道内的步骤内; 火车的步行行程与较厚的管段的位置相关,并与水体床上的管道的着陆点相关。