Abstract:
A method for reconditioning a hot gas path part of a gas turbine in order to flexibly adapt an operation regime of said gas turbine for subsequent operation intervals is disclosed. The method includes providing a hot gas path part to be reconditioned; removing a predetermined area of said hot gas path part, resulting in a cutout at said hot gas path part; and manufacturing a coupon for being inserted into said cutout to replace said removed area of said hot gas path part. The method further includes inserting said coupon into said cutout; and joining said hot gas path part with said inserted coupon. The coupon is manufactured by a selective laser melting (SLM) method resulting in a fine grain sized material with significantly improved low cycle fatigue (LCF) lifetime. The hot gas path part is coated, at least in an area comprising said inserted coupon, with a metallic overlay with improved thermo-mechanical fatigue (TMF) and oxidation lifetime.