-
1.
公开(公告)号:US11674366B2
公开(公告)日:2023-06-13
申请号:US16436402
申请日:2019-06-10
Inventor: Sumeet Trehan , Damian N. Burch , Amr S. El-Bakry , Peeyush Bhargava , Curtis J. Holub , Jose F. Zapata Usandivaras
IPC: E21B41/00 , E21B43/12 , E21B49/08 , E21B47/008
CPC classification number: E21B41/0092 , E21B43/128 , E21B47/008 , E21B49/08 , E21B49/0875
Abstract: A method of predicting hydrocarbon production from one or more artificial lift wells is disclosed. Measurements and/or well test data are obtained from one or more artificial lift wells representing well performance at more than one time period. A statistical model, representing well performance, is generated. Using the statistical model and the measurements and/or well test data, real-time production of the one or more artificial lift wells is predicted and a measure of confidence is generated. Potential optimization opportunities are identified for well performance based on the predicted real-time production of the one or more artificial lift wells. The optimization opportunities are outputted. Hydrocarbon production activities are modified using the optimization opportunities.