-
公开(公告)号:US11967822B2
公开(公告)日:2024-04-23
申请号:US17489805
申请日:2021-09-30
Applicant: KOREA INSTITUTE OF SCIENCE AND TECHNOLOGY
Inventor: Ig Jae Kim , Heeseung Choi , Yeji Choi , Jisoo Kim
CPC classification number: H02J3/004 , G05B13/0265 , G05B13/048 , H02J2203/20
Abstract: Embodiments relate to a method for predicting power generation and remaining useful life to predict operational soundness of a power plant and a system for performing the same, the method including acquiring sensing data from each of a plurality of sensors included in a plurality of systems in the power plant, outputting each of a predicted power generation and a predicted remaining useful life from a measurement value in sensing data of an input sensor through a pre-trained prediction model, assessing the operational soundness in aspect of the power generation and the remaining useful life using a prediction result and a current result in each aspect, and determining the operational soundness of the system based on prediction uncertainty and an assessment result in aspect of the power generation and the remaining useful life.