1.
公开(公告)号:US20230410012A1
公开(公告)日:2023-12-21
申请号:US18091663
申请日:2022-12-30
Applicant: Qingdao University of Technology
Inventor: Liming Zhang , Zhongyuan Liu , Yu Cong , Xiaoshan Wang , Zaiquan Wang , Fanxiu Chen , Jinfeng Cao
IPC: G06Q10/0635 , G06Q50/26 , G06F18/25 , G06N3/0442 , G06N3/08
CPC classification number: G06Q10/0635 , G06Q50/265 , G06F18/251 , G06N3/0442 , G06N3/08
Abstract: A project disaster warning method and system based on collaborative fusion of multi-physical field monitoring data is provided. The method includes: acquiring and preprocessing multi-sensor real-time monitoring data of potentially dangerous parts of a project structure; normalizing multi-physical field monitoring time sequence data to construct a normalized sample matrix; analyzing sensitivities of various physical field monitoring indicators to a safety state of a project by using a multivariate statistical method; guiding initialization training of a LSTM network according to the sensitivities, and obtaining output results of the LSTM network; obtaining basic probability assignments of various warning levels after fusion according to an improved D-S evidence theory based on Chebyshev distance, with the output results of the LSTM network as evidence inputs; determining disaster danger levels of the potentially dangerous parts of the project structure using a basic probability assignment-based decision method.
-
公开(公告)号:US12123292B1
公开(公告)日:2024-10-22
申请号:US18606428
申请日:2024-03-15
Inventor: Kai Zhang , Guojing Xin , Zhongzheng Wang , Piyang Liu , Liming Zhang , Xia Yan , Huaqing Zhang , Zifeng Sun , Feng Jia
CPC classification number: E21B43/16 , G06F30/28 , G06N3/092 , E21B2200/20
Abstract: A differentiated real-time injection-production optimization adjustment method of an intelligent injection-production linkage device belongs to the field of oil reservoir injection-production technologies. The method includes: initializing networks; building an injection-production environment model; by an agent, reading an initial state of an injection-production environment; writing a file by an injection-production policy network; obtaining state data of the moment t+1; reading a next state and an economic net present value within the time step; assigning the next state to the current state until a to-be-optimized production period is completed; by batch training on the model, updating a parameter of the environment agent model; updating a parameter of the action evaluation network and a parameter of the injection-production policy network; repeating the above steps until an optimal model is obtained; based on the stored optimal model, linking the intelligent injection-production device to obtain state information of the oil reservoir.
-
公开(公告)号:US20240410870A1
公开(公告)日:2024-12-12
申请号:US18595510
申请日:2024-03-05
Applicant: Qingdao University of Technology
Inventor: Liming Zhang , Tao Lan , Faxing Zhang , Zhongyuan Liu , Juan Lan
IPC: G01N33/2045 , G06N5/01 , G06N5/048
Abstract: The present disclosure relates to a multi-factor coupling cooperative early warning method and system for fatigue crack propagation of a steel structure. The multi-factor coupling cooperative early warning method includes: obtaining multi-physical field monitoring data of a dangerous source distribution point of a steel structure project, and obtaining a monitoring time series data set; establishing an intuitionistic fuzzy matrix of the monitoring time series data set; obtaining uncertainties of indexes by using a grey relation coefficient between the monitoring indexes of physical fields; taking obtained uncertainties as basic probability assignments of evidences; preprocessing the evidences through weighed averaging, and obtaining corrected basic probability assignments; obtaining basic probability assignments of fatigue crack propagation of the steel structure at different development stages; and determining a fatigue crack propagation grade of the dangerous source distribution point of the steel structure project through the basis probability assignment.
-
-