-
公开(公告)号:US20170314268A1
公开(公告)日:2017-11-02
申请号:US15522776
申请日:2014-12-03
发明人: Bo WU , Simin JIAN
摘要: An I-shaped steel with discontinuous top flange reinforced compound concrete beam containing demolished concrete lumps and a construction process thereof. The beam comprises an I-shaped steel having discontinuous top flange, longitudinal bars (7), stirrups (6), waist bars (8), fresh concrete (5), and demolished concrete lumps (4). The I-shaped steel having discontinuous top flange consists of a bottom flange plate (3), a web (2) and a discontinuous top flange plate (I). The discontinuous top flange plate (1) consists of two rectangle steel plates or trapezoid steel plates located at both sides of the I-shaped steel. The two steel plates have a same length that is one third of a length of the I-shaped steel. The trapezoid steel plate has a width of a short side no less than a quarter of a width of the long side. The recycled compound concrete beam saves steel, fully uses the demolished concrete lumps, and is convenient to construct.
-
2.
公开(公告)号:US20180340334A1
公开(公告)日:2018-11-29
申请号:US16056384
申请日:2018-08-06
发明人: Bo WU , Simin JIAN
摘要: A method of construction process of a reinforced compound concrete beam containing demolished concrete lumps comprising following steps. Form an I-shaped steel member with a discontinuous top flange by welding a bottom flange plate, a web and two steel plates. Set up a bottom die of the reinforced compound concrete beam. After hoisting the I-shaped steel member with the discontinuous top flange in position, bind longitudinal bars, waist bars and stirrups, and finally set up a side die. (2) Wet the demolished concrete lumps, pour the fresh concrete with a thickness of 20-30 mm inside a cavity formed by the bottom die and the side die, and then put a layer of the wet demolished concrete lumps in a gap between the two steel plates. The two steel plates are two rectangle steel plates or two trapezoid steel plates. Stir artificially so that the demolished concrete lumps are uniformly distributed inside the cavity formed by the bottom die and the side die. Pour a layer of fresh concrete into the cavity and vibrate the demolished concrete lumps and the fresh concrete in the cavity, so that the demolished concrete lumps are uniformly distributed in the fresh concrete. Repeatedly and alternately pour the fresh concrete and the demolished concrete lumps until the cavity is filled.
-