-
1.
公开(公告)号:US11886453B2
公开(公告)日:2024-01-30
申请号:US17515137
申请日:2021-10-29
Applicant: SPLUNK Inc.
Inventor: Sunil Kittinakere Nagesh Koundinya , Ramakrishnan Hariharan Chandrasekharapuram , Paul Ingram
IPC: G06F16/2458 , G06F16/22
CPC classification number: G06F16/2474 , G06F16/22 , G06F16/2477
Abstract: Described are systems, methods, and techniques for collecting, analyzing, processing, and storing time series data and for evaluating and determining whether and how to include late or delayed data points when publishing or storing the time series data. Maximum delay values can identify a duration for waiting for late or delayed data, such as prior to publication. In some examples, maximum delay values can be dynamically adjustable based on a statistical evaluation process. For late or delayed data points that are received after the maximum delay elapses, some data points can be included in the stored time series data, such as if they are received in the same order that they are generated.
-
2.
公开(公告)号:US20230137103A1
公开(公告)日:2023-05-04
申请号:US17515137
申请日:2021-10-29
Applicant: SPLUNK Inc.
Inventor: Sunil Kittinakere Nagesh Koundinya , Ramakrishnan Hariharan Chandrasekharapuram , Paul Ingram
IPC: G06F16/2458 , G06F16/22
Abstract: Described are systems, methods, and techniques for collecting, analyzing, processing, and storing time series data and for evaluating and determining whether and how to include late or delayed data points when publishing or storing the time series data. Maximum delay values can identify a duration for waiting for late or delayed data, such as prior to publication. In some examples, maximum delay values can be dynamically adjustable based on a statistical evaluation process. For late or delayed data points that are received after the maximum delay elapses, some data points can be included in the stored time series data, such as if they are received in the same order that they are generated.
-
公开(公告)号:US11886451B2
公开(公告)日:2024-01-30
申请号:US17515140
申请日:2021-10-29
Applicant: SPLUNK Inc.
Inventor: Sunil Kittinakere Nagesh Koundinya , Ramakrishnan Hariharan Chandrasekharapuram , Paul Ingram , Joseph Ari Ross
IPC: G06F16/2458
CPC classification number: G06F16/2462 , G06F16/2474 , G06F16/2477
Abstract: Described are systems, methods, and techniques for collecting, analyzing, processing, and storing time series data and for evaluating and determining whether and how to include late or delayed data points for inclusion when publishing or storing the time series data. Maximum delay values can identify a duration for waiting for late or delayed data, such as prior to publication. In some examples, maximum delay values can be dynamically adjustable based on a statistical evaluation process. For late or delayed data points that are received after the maximum delay elapses, some data points can be included in the stored time series data, such as if they are received in the same order that they are generated.
-
公开(公告)号:US11720591B1
公开(公告)日:2023-08-08
申请号:US17390767
申请日:2021-07-30
Applicant: Splunk Inc.
Inventor: Difan Zhao , Uday Sagar Shiramshetty , Paul Ingram
IPC: G06F16/26 , G06F16/248 , G06F16/245
CPC classification number: G06F16/26 , G06F16/245 , G06F16/248
Abstract: Various aspects of the subject technology relate to systems, methods, and machine-readable media for visualizing performance data of infrastructure components. The method includes receiving a query through an application for a metric for an infrastructure component, the metric comprising metric time series (MTS) data. The method also includes identifying sources for the metric. The method also includes querying the identified sources for the metric. The method also includes selecting from the identified sources best available data for the metric based on a selection algorithm. The method also includes enriching the best available data comprising linking dimensions and properties from the identified sources to the best available data. The method also includes causing display of the enriched best available data through a user interface of the application.
-
公开(公告)号:US20230136216A1
公开(公告)日:2023-05-04
申请号:US17515140
申请日:2021-10-29
Applicant: SPLUNK Inc.
Inventor: Sunil Kittinakere Nagesh Koundinya , Ramakrishnan Hariharan Chandrasekharapuram , Paul Ingram , Joseph Ari Ross
IPC: G06F16/2458
Abstract: Described are systems, methods, and techniques for collecting, analyzing, processing, and storing time series data and for evaluating and determining whether and how to include late or delayed data points for inclusion when publishing or storing the time series data. Maximum delay values can identify a duration for waiting for late or delayed data, such as prior to publication. In some examples, maximum delay values can be dynamically adjustable based on a statistical evaluation process. For late or delayed data points that are received after the maximum delay elapses, some data points can be included in the stored time series data, such as if they are received in the same order that they are generated.
-
-
-
-