-
公开(公告)号:US20250154868A1
公开(公告)日:2025-05-15
申请号:US18425890
申请日:2024-01-29
Applicant: Taiyuan University of Technology
Inventor: Guorui Feng , Xiaoze Wen , Jun Guo , Ruipeng Qian , Wenbo Huang , Jie Zhang , Wenming Feng , Zi Wang , Xu Zhang
Abstract: An electric-pulse fracturing device for hard roof of coal mine based on a self-sealing water bag and an using method thereof are provided. The device includes a power switch, a charging power supply, a current limiting protection resistor, an energy storage capacitor and a high-voltage electric pulse switch connected in sequence. The energy storage capacitor is connected with an end of a gas gap switch, an other end of the gas gap switch is connected with an assembled self-sealing water bag high-voltage electric pulse electrode structure through a high-voltage cable, and the electrode structure is fixed through an assembly rod. The self-sealing water bag high-voltage electric pulse electrode structure includes a self-sealing water bag and an electrode structure capable of focusing shock wave energy, and the number of the self-sealing water bag high-voltage electric pulse electrode structure depends on fracturing effect.
-
公开(公告)号:US11959383B2
公开(公告)日:2024-04-16
申请号:US17752842
申请日:2022-05-24
Applicant: Taiyuan University of Technology
Inventor: Guorui Feng , Yijiang Fan , Pengfei Wang , Chenliang Hao , Xiaoze Wen , Jun Guo , Jinwen Bai , Tingye Qi , Jianan Liu , Linjun Zhu , Changquan Wu
CPC classification number: E21C41/18 , E21D20/028
Abstract: A method for carrying out grouting between adjacent gateroads in internal-staggered split-level coal mining. A return air gateroad of a stoping face and an inlet air gateroad of a heading face are not on the same level. The return air gateroad of the stoping face is arranged along a roof of a coal seam. The inlet air gateroad of the heading face is arranged along a floor of the coal seam. There is a height difference between the return air gateroad and the inlet air gateroad in a vertical direction. During the construction process, the inlet air gateroad is excavated at a delay distance of 180-200 meters from the return air gateroad. The drilling and grouting are performed while excavating the roadway, where grouting holes are arranged in a single row. A device for implementing the method is also provided.
-