公开(公告)号:US11959383B2
公开(公告)日:2024-04-16
申请号:US17752842
申请日:2022-05-24
发明人: Guorui Feng , Yijiang Fan , Pengfei Wang , Chenliang Hao , Xiaoze Wen , Jun Guo , Jinwen Bai , Tingye Qi , Jianan Liu , Linjun Zhu , Changquan Wu
CPC分类号: E21C41/18 , E21D20/028
摘要: A method for carrying out grouting between adjacent gateroads in internal-staggered split-level coal mining. A return air gateroad of a stoping face and an inlet air gateroad of a heading face are not on the same level. The return air gateroad of the stoping face is arranged along a roof of a coal seam. The inlet air gateroad of the heading face is arranged along a floor of the coal seam. There is a height difference between the return air gateroad and the inlet air gateroad in a vertical direction. During the construction process, the inlet air gateroad is excavated at a delay distance of 180-200 meters from the return air gateroad. The drilling and grouting are performed while excavating the roadway, where grouting holes are arranged in a single row. A device for implementing the method is also provided.