Optimized machining controller for automatic machining device and automatic machining device with said controller
    1.
    发明申请
    Optimized machining controller for automatic machining device and automatic machining device with said controller 审中-公开
    用于自动加工装置的优化加工控制器和具有所述控制器的自动加工装置

    公开(公告)号:US20060079987A1

    公开(公告)日:2006-04-13

    申请号:US11060285

    申请日:2005-02-18

    申请人: Baeg Cha Jin Hwang

    发明人: Baeg Cha Jin Hwang

    IPC分类号: G06F19/00

    摘要: Disclosed is a controller for an automatic machining device which conducts machaining of a workpiece based on NC data. The controller comprises a data input section to which NC data are inputted; a database storage section for storing optimal machining data optimized for machining conditions; an operating section for comparing the NC data and the optimal machining data and calculating optimized NC data; and a control section for controlling the automatic machining device in conformity with the optimized NC data calculated by the operating section.

    摘要翻译: 公开了一种用于基于NC数据进行工件加工的自动加工装置的控制器。 所述控制器包括输入NC数据的数据输入部; 用于存储针对加工条件优化的最佳加工数据的数据库存储部分; 用于比较NC数据和最佳加工数据并计算优化的NC数据的操作部分; 以及控制部分,用于根据由操作部分计算出的优化的NC数据来控制自动加工装置。

    Connection method of placing and receiving an order for mold machining through a web-based system for real-time utilization of idle facilities for molds
    2.
    发明申请
    Connection method of placing and receiving an order for mold machining through a web-based system for real-time utilization of idle facilities for molds 审中-公开
    通过基于网络的系统放置和接收模具加工订单的连接方法,用于模具的空闲设备的实时利用

    公开(公告)号:US20060136304A1

    公开(公告)日:2006-06-22

    申请号:US11091628

    申请日:2005-03-29

    申请人: Baeg Cha Yong Cho

    发明人: Baeg Cha Yong Cho

    IPC分类号: G06Q30/00

    摘要: Disclosed is a connection method of placing and receiving an order for mold machining through the web-based system for real-time utilization of idle facilities for mold, comprising: entering information relating to holding facilities held by the subcontractors for mold machining in database, wherein the subcontractors are members entering the information and receiving an order for mold machining; and searching the database for the information relating to holding facilities, wherein the mold manufacturers are members searching the information and placing an order for mold machining; wherein the subcontractors enter idle time period of idle facilities of the holding facilities in database and the mold manufacturers regard the idle facilities for the idle time period as the facilities held by the mold manufacturers, whereby ERP scheduling is possible.

    摘要翻译: 公开了一种通过基于网络的系统放置和接收模具加工订单的连接方法,用于模具的空闲设备的实时利用,包括:输入与分包商在数据库中进行模具加工所持有的与保持设备有关的信息,其中 分包商是进入信息并接受模具加工订单的成员; 并在数据库中搜索与保持设备相关的信息,其中模具制造商是搜索信息并下订单的模具加工的成员; 其中分包商进入数据库中的保持设施的空闲设施的空闲时间段,并且模具制造商将空闲时间段的闲置设施视为由模具制造商持有的设施,由此可以进行ERP调度。