Method of testing boiler tube integrity and probe for same
    1.
    发明授权
    Method of testing boiler tube integrity and probe for same 有权
    测试锅炉管完整性和探头的方法相同

    公开(公告)号:US06502452B1

    公开(公告)日:2003-01-07

    申请号:US09650925

    申请日:2000-08-29

    IPC分类号: G01M304

    摘要: A tube testing system consists of two subassemblies, the probe and the applicator. The probe uses a stack of Belleville style washers that when compressed allow the locking fingers to relax and the probe to be inserted into the tube. Once the probe is placed in the correct location using the applicator, the Belleville style washers are allowed to expand, locking in the fingers and engaging the urethane seals. As the water fills the tube, the air is pushed through a bleed hole in the mandrel of the probe. The bleed hole leads to a chamber in the top of the probe that contains a plastic ball. The ball floats on water and as the chamber fills, the ball seals off the leak path and the tube can then be pressurized and the test performed. Once the test is complete, the water is drained and using the applicator, the probe is removed from the tube.

    摘要翻译: 管测试系统由两个子组件,探针和施加器组成。 探头使用一叠Belleville型垫圈,当压缩时,可以使锁定手指放松,并将探头插入管中。 一旦使用涂抹器将探头放置在正确的位置,就可以使Belleville型垫圈膨胀,锁定手指并与聚氨酯密封接合。 当水填充管时,空气被推动通过探针心轴中的放气孔。 排放孔通向探头顶部的包含塑料球的腔室。 球浮在水面上,随着腔室的填充,球密封泄漏路径,然后可以对管进行加压并进行测试。 一旦测试完成,排水并使用涂抹器,将探头从管中取出。