-
公开(公告)号:US07870909B2
公开(公告)日:2011-01-18
申请号:US11309012
申请日:2006-06-08
IPC分类号: E21B33/12
摘要: A method of providing zonal isolation in a wellbore completion includes the steps of identifying an anticipated zone for isolation in a wellbore before completing the wellbore; selecting, before completing the wellbore, a completion assembly and a cooperative deployable isolation assembly to isolate the anticipated zone; completing the wellbore with the selected completion assembly; and connecting the selected deployable isolation assembly in the selected completion assembly to isolate the anticipated zone.
摘要翻译: 在井眼完井中提供区域分离的方法包括在完成井眼之前确定在井筒中分离的预期区域的步骤; 在完成井筒之前,选择一个完井组件和一个协调的可部署隔离组件来隔离预期的区域; 用选定的完成组件完成井筒; 并将所选择的可部署隔离组件连接到所选择的完成组件中以隔离预期区域。