Method and apparatus utilizing a hollow beam for constructing subterranean walls comprised of granular material
    1.
    发明授权
    Method and apparatus utilizing a hollow beam for constructing subterranean walls comprised of granular material 失效
    利用中空梁来构造由颗粒材料构成的地下壁的方法和装置

    公开(公告)号:US06247875B1

    公开(公告)日:2001-06-19

    申请号:US09465576

    申请日:1999-12-17

    IPC分类号: E02D518

    摘要: A method and apparatus is provided for producing subterranean walls comprised of granular material. The apparatus comprises a beam for making insertions into and extractions out of the ground to form a series of voids therein. The beam includes a hollow interior portion which receives a supply of granular material. The beam also has a plurality of outwardly projecting spurs on the outer faces thereof for scarfing the sidewalls of the void as the beam is extracted. The apparatus also includes a disposable shoe which is removably attached to the open bottom portion of the beam to prevent earthen material from entering the hollow interior portion of the beam as the beam is inserted into the ground. An actuating mechanism detaches the shoe from the open bottom portion of the beam after the beam has been inserted into the ground so that granular material is released into the void as the beam is extracted therefrom. The method comprises the following steps: suspending the beam above the ground; removably installing a disposable shoe onto the open bottom portion of the beam; inserting the beam and the removably installed shoe into the ground to form a void therein; delivering granular material to the hollow interior portion of the beam; detaching the shoe from the bottom portion of the beam; and extracting the beam from the ground while the spurs cut vertical channels in the sidewalls of the void and granular material flows through the open bottom portion thereof to fill the void with granular material.

    摘要翻译: 提供了一种用于生产由颗粒材料组成的地下壁的方法和装置。 该装置包括一个用于在地面中进行插入和抽出的梁,以在其中形成一系列的空隙。 梁包括容纳颗粒材料供应的中空内部部分。 梁在其外表面上还具有多个向外突出的突出部分,用于当梁被提取时用于对空隙的侧壁进行切割。 该设备还包括可拆卸地附接到梁的开口底部的一次性鞋,以防止当梁插入地面时土壤材料进入梁的中空内部。 在梁已经插入地面之后,致动机构将梁从开口的底部分离开,使得当梁被从其中提取时,颗粒材料被释放到空隙中。 该方法包括以下步骤:将梁悬挂在地面上; 可拆卸地将一次性鞋安装在梁的敞开的底部上; 将梁和可拆卸地安装的鞋子插入地面以在其中形成空隙; 将颗粒材料输送到梁的中空内部; 将鞋从梁的底部分离; 并且在所述空隙的侧壁中的所述马刺切割垂直通道的同时从所述地面提取所述梁,并且所述颗粒材料流过其开口底部以用颗粒材料填充所述空隙。

    Method and apparatus for constructing subterranean walls comprised of
granular material
    2.
    发明授权
    Method and apparatus for constructing subterranean walls comprised of granular material 失效
    用于构造由颗粒材料组成的地下墙的方法和装置

    公开(公告)号:US6030150A

    公开(公告)日:2000-02-29

    申请号:US30703

    申请日:1998-02-25

    摘要: A method and apparatus is provided for producing subterranean walls comprised of granular material. The apparatus comprises a beam for making insertions into and extractions out of the ground. The beam includes a top portion, an open bottom portion, and a hollow interior portion therebetween which receives a supply of granular material. In usage, the beam is inserted into the ground to form a void therein. The apparatus also includes a disposable shoe which is removably attached to the open bottom portion of the beam. In usage, the shoe prevents earthen material from entering the hollow interior portion of the beam as the beam is inserted into the ground. The apparatus further includes an actuating mechanism which detaches the shoe from the open bottom portion of the beam after the beam has been inserted into the ground so that granular material is released into the void as the beam is extracted therefrom. The method comprises the following steps: suspending the beam above the ground; removably installing a disposable shoe onto the open bottom portion of the beam; inserting the beam and the removably installed shoe into the ground to form a void therein; delivering granular material to the hollow interior portion of the beam; detaching the shoe from the bottom portion of the beam; and extracting the beam from the ground while granular material flows through the open bottom portion thereof to fill the void with granular material.

    摘要翻译: 提供了一种用于生产由颗粒材料组成的地下壁的方法和装置。 该装置包括一个用于从地面插入和拔出的梁。 梁包括顶部,敞开的底部以及在其间的中空的内部部分,其接收颗粒材料的供应。 在使用中,将梁插入地面以在其中形成空隙。 该设备还包括可拆卸地附接到梁的敞开的底部的一次性鞋。 在使用中,当梁插入地面时,鞋防止土壤材料进入梁的中空内部。 该装置还包括致动机构,该致动机构在梁已经插入地面之后将鞋从开放的底部分离开,使得当梁被从其中提取时,颗粒材料被释放到空隙中。 该方法包括以下步骤:将梁悬挂在地面上; 可拆卸地将一次性鞋安装在梁的敞开的底部上; 将梁和可拆卸地安装的鞋子插入地面以在其中形成空隙; 将颗粒材料输送到梁的中空内部; 将鞋从梁的底部分离; 并从颗粒材料流过其底部的开放底部提取梁,以用颗粒材料填充空隙。