-
公开(公告)号:US20140301788A1
公开(公告)日:2014-10-09
申请号:US14245678
申请日:2014-04-04
申请人: Jon KHACHATURIAN , E. John GREEVES
发明人: Jon KHACHATURIAN , E. John GREEVES
IPC分类号: E02B17/08
CPC分类号: E02B17/0809 , E02B17/027 , E02B17/08 , E02B2017/0039 , E02B2017/0056
摘要: A method of elevating the deck area of a marine platform (e.g., oil and gas well drilling or production platform) utilizes a specially configured sleeve support to support the platform legs so that they can be cut. Once cut, rams or jacks elevate the platform above the cuts. The sleeve support is then connected (e.g., welded) to the platform leg and becomes part of the structural support for the platform. In one embodiment, two sleeves are employed. In another embodiment, the jacks or rams elevate in two stages including a first stage wherein one sleeve elevates and the other sleeve does not elevate and a second stage wherein both sleeves elevate together.
-
公开(公告)号:US20140241814A1
公开(公告)日:2014-08-28
申请号:US14188263
申请日:2014-02-24
申请人: Jon Khachaturian , E. John Greeves
发明人: Jon Khachaturian , E. John Greeves
IPC分类号: E02B17/08
CPC分类号: E02B17/0809 , E02B17/0034 , E02B17/021 , E02B17/027 , E02B2017/0056 , E02B2017/0073 , E02B2017/0095
摘要: A method of elevating the deck area of a marine platform (e.g., oil and gas well drilling or production platform) utilizes a specially configured sleeve support to support the platform legs so that they can be cut. Once cut, rams or jacks elevate the platform above the cuts. The sleeve support is then connected (e.g., welded) to the platform leg and becomes part of the structural support for the platform. In one embodiment, two sleeves are employed. In another embodiment, the jacks or rams elevate in two stages including a first stage wherein one sleeve elevates and the other sleeve does not elevate and a second stage wherein both sleeves elevate together.
摘要翻译: 提升海洋平台(例如油气井钻井或生产平台)的甲板区域的方法利用特殊构造的套筒支撑件来支撑平台腿,使得它们能被切割。 一旦切割,公羊或千斤顶将平台提升到切口上方。 然后将套管支撑件(例如,焊接)连接到平台腿部并且成为平台的结构支撑件的一部分。 在一个实施例中,采用两个套筒。 在另一个实施例中,千斤顶或公柱在两个阶段中升高,包括第一阶段,其中一个套筒升高并且另一个套筒不升高,以及第二阶段,其中两个套筒一起升高。
-
公开(公告)号:US08657532B2
公开(公告)日:2014-02-25
申请号:US13741690
申请日:2013-01-15
申请人: E. John Greeves , Jon Khachaturian
发明人: E. John Greeves , Jon Khachaturian
IPC分类号: E02B17/08
CPC分类号: E02B17/0809 , E02B17/0034 , E02B17/021 , E02B17/027 , E02B2017/0056 , E02B2017/0073 , E02B2017/0095
摘要: A method of elevating the deck area of a marine platform (e.g., oil and gas well drilling or production platform) utilizes a specially configured sleeve support to support the platform legs so that they can be cut. Once cut, rams or jacks elevate the platform above the cuts. The sleeve support is then connected (e.g., welded) to the platform leg and becomes part of the structural support for the platform. In one embodiment, two sleeves are employed. In another embodiment, the jacks or rams elevate in two stages including a first stage wherein one sleeve elevates and the other sleeve does not elevate and a second stage wherein both sleeves elevate together.
摘要翻译: 提升海洋平台(例如油气井钻井或生产平台)的甲板区域的方法利用特殊构造的套筒支撑件来支撑平台腿,使得它们能被切割。 一旦切割,公羊或千斤顶将平台提升到切口上方。 然后将套管支撑件(例如,焊接)连接到平台腿部并且成为平台的结构支撑件的一部分。 在一个实施例中,采用两个套筒。 在另一个实施例中,千斤顶或公柱在两个阶段中升高,包括第一阶段,其中一个套筒升高并且另一个套筒不升高,以及第二阶段,其中两个套筒一起升高。
-
公开(公告)号:US09926683B2
公开(公告)日:2018-03-27
申请号:US15289554
申请日:2016-10-10
申请人: Jon Khachaturian , E. John Greeves
发明人: Jon Khachaturian , E. John Greeves
CPC分类号: E02B17/0809 , E02B17/0034 , E02B17/021 , E02B17/027 , E02B2017/0056 , E02B2017/0073 , E02B2017/0095
摘要: A method of elevating the deck area of a marine platform (e.g., oil and gas well drilling or production platform) utilizes a specially configured sleeve support to support the platform legs so that they can be cut. Once cut, rams or jacks elevate the platform above the cuts. The sleeve support is then connected (e.g., welded) to the platform leg and becomes part of the structural support for the platform. In one embodiment, two sleeves are employed. In another embodiment, the jacks or rams elevate in two stages including a first stage wherein one sleeve elevates and the other sleeve does not elevate and a second stage wherein both sleeves elevate together.
-
公开(公告)号:US10017909B2
公开(公告)日:2018-07-10
申请号:US15612576
申请日:2017-06-02
申请人: Jon Khachaturian , E. John Greeves
发明人: Jon Khachaturian , E. John Greeves
CPC分类号: E02B17/0809 , E02B17/027 , E02B17/08 , E02B2017/0039 , E02B2017/0056
摘要: A method of elevating the deck area of a marine platform (e.g., oil and gas well drilling or production platform) utilizes a specially configured sleeve support to support the platform legs so that they can be cut. Once cut, rams or jacks elevate the platform above the cuts. The sleeve support is then connected (e.g., welded) to the platform leg and becomes part of the structural support for the platform. In one embodiment, two sleeves are employed. In another embodiment, the jacks or rams elevate in two stages including a first stage wherein one sleeve elevates and the other sleeve does not elevate and a second stage wherein both sleeves elevate together.
-
公开(公告)号:US20170096790A1
公开(公告)日:2017-04-06
申请号:US15289554
申请日:2016-10-10
申请人: Jon KHACHATURIAN , E. John GREEVES
发明人: Jon KHACHATURIAN , E. John GREEVES
CPC分类号: E02B17/0809 , E02B17/0034 , E02B17/021 , E02B17/027 , E02B2017/0056 , E02B2017/0073 , E02B2017/0095
摘要: A method of elevating the deck area of a marine platform (e.g., oil and gas well drilling or production platform) utilizes a specially configured sleeve support to support the platform legs so that they can be cut. Once cut, rams or jacks elevate the platform above the cuts. The sleeve support is then connected (e.g., welded) to the platform leg and becomes part of the structural support for the platform. In one embodiment, two sleeves are employed. In another embodiment, the jacks or rams elevate in two stages including a first stage wherein one sleeve elevates and the other sleeve does not elevate and a second stage wherein both sleeves elevate together.
-
公开(公告)号:US20130223936A1
公开(公告)日:2013-08-29
申请号:US13741690
申请日:2013-01-15
申请人: Jon KHACHATURIAN , E. John GREEVES
发明人: Jon KHACHATURIAN , E. John GREEVES
IPC分类号: E02B17/08
CPC分类号: E02B17/0809 , E02B17/0034 , E02B17/021 , E02B17/027 , E02B2017/0056 , E02B2017/0073 , E02B2017/0095
摘要: A method of elevating the deck area of a marine platform (e.g., oil and gas well drilling or production platform) utilizes a specially configured sleeve support to support the platform legs so that they can be cut. Once cut, rams or jacks elevate the platform above the cuts. The sleeve support is then connected (e.g., welded) to the platform leg and becomes part of the structural support for the platform. In one embodiment, two sleeves are employed. In another embodiment, the jacks or rams elevate in two stages including a first stage wherein one sleeve elevates and the other sleeve does not elevate and a second stage wherein both sleeves elevate together.
-
公开(公告)号:US08353643B2
公开(公告)日:2013-01-15
申请号:US12861589
申请日:2010-08-23
申请人: Jon Khachaturian , E. John Greeves
发明人: Jon Khachaturian , E. John Greeves
IPC分类号: E02B17/08
CPC分类号: E02B17/0809 , E02B17/0034 , E02B17/021 , E02B17/027 , E02B2017/0056 , E02B2017/0073 , E02B2017/0095
摘要: A method of elevating the deck area of a marine platform (e.g., oil and gas well drilling or production platform) utilizes a specially configured sleeve support to support the platform legs so that they can be cut. Once cut, rams or jacks elevate the platform above the cuts. The sleeve support is then connected (e.g., welded) to the platform leg and becomes part of the structural support for the platform. In one embodiment, two sleeves are employed. In another embodiment, the jacks or rams elevate in two stages including a first stage wherein one sleeve elevates and the other sleeve does not elevate and a second stage wherein both sleeves elevate together.
-
公开(公告)号:US20110044763A1
公开(公告)日:2011-02-24
申请号:US12861589
申请日:2010-08-23
申请人: Jon Khachaturian , E. John Greeves
发明人: Jon Khachaturian , E. John Greeves
IPC分类号: E02B17/08
CPC分类号: E02B17/0809 , E02B17/0034 , E02B17/021 , E02B17/027 , E02B2017/0056 , E02B2017/0073 , E02B2017/0095
摘要: A method of elevating the deck area of a marine platform (e.g., oil and gas well drilling or production platform) utilizes a specially configured sleeve support to support the platform legs so that they can be cut. Once cut, rams or jacks elevate the platform above the cuts. The sleeve support is then connected (e.g., welded) to the platform leg and becomes part of the structural support for the platform. In one embodiment, two sleeves are employed. In another embodiment, the jacks or rams elevate in two stages including a first stage wherein one sleeve elevates and the other sleeve does not elevate and a second stage wherein both sleeves elevate together.
摘要翻译: 提升海洋平台(例如油气井钻井或生产平台)的甲板区域的方法利用特殊构造的套筒支撑件来支撑平台腿,使得它们能被切割。 一旦切割,公羊或千斤顶将平台提升到切口上方。 然后将套管支撑件(例如,焊接)连接到平台腿部并且成为平台的结构支撑件的一部分。 在一个实施例中,采用两个套筒。 在另一个实施例中,千斤顶或公柱在两个阶段中升高,包括第一阶段,其中一个套筒升高并且另一个套筒不升高,以及第二阶段,其中两个套筒一起升高。
-
公开(公告)号:US07780375B1
公开(公告)日:2010-08-24
申请号:US11749587
申请日:2007-05-16
申请人: Jon Khachaturian , E. John Greeves
发明人: Jon Khachaturian , E. John Greeves
IPC分类号: E02B17/08
CPC分类号: E02B17/027 , E02B17/0809 , E02B17/0872
摘要: A method of elevating the deck area of a marine platform (e.g. oil and gas well drilling or production platform) utilizes a specially configured sleeve support to support the platform legs so that they can be cut. Once cut, jacks elevate the platform above the cuts. The sleeve support is then connected (e.g. welded) to the platform leg and becomes part of the structural support for the platform.
摘要翻译: 提升海洋平台(例如油气井钻井或生产平台)的甲板区域的方法利用特殊构造的套筒支撑件来支撑平台腿,使得它们能被切割。 一旦切割,千斤顶将平台提升到切割之上。 然后将套管支撑件(例如焊接)连接到平台腿部,并成为平台的结构支撑件的一部分。
-
-
-
-
-
-
-
-
-