摘要:
Power distribution systems that have a limited peak power capability or a high source impedance, such as site supply generators, are often susceptible to abnormal operation in response to the current drawn at power up from the loads connected to the power distribution system. The present invention provides a lighting control system operable to power up a plurality of the lighting loads in sequence to reduce stress on the power distribution system. The lighting loads are each turned on as part of a startup sequence at predetermined times after an output voltage of the power distribution system has stabilized. The lighting control system is operable to begin the startup sequence in response to receiving a control signal representative that the power distribution system has stabilized. The lighting loads are each controlled by a lighting control module, which is operable to wait for a predetermined amount of time for the startup sequence to begin before turning on the lighting loads.
摘要:
Power distribution systems that have a limited peak power capability or a high source impedance, such as site supply generators, are often susceptible to abnormal operation in response to the current drawn at power up from the loads connected to the power distribution system. The present invention provides a load control module for a lighting control system operable to start up a plurality of the lighting loads in sequence to reduce stress on the power distribution system. The lighting loads are each turned on as part of a startup sequence at predetermined times after an output voltage of the power distribution system has stabilized. The lighting control module is operable to wait for a predetermined amount of time for the startup sequence to begin before turning on the lighting loads.
摘要:
Power distribution systems that have a limited peak power capability or a high source impedance, such as site supply generators, are often susceptible to abnormal operation in response to the current drawn at power up from the loads connected to the power distribution system. The present invention provides a lighting control system operable to power up a plurality of the lighting loads in sequence to reduce stress on the power distribution system. The lighting loads are each turned on as part of a startup sequence at predetermined times after an output voltage of the power distribution system has stabilized. The lighting control system is operable to begin the startup sequence in response to receiving a control signal representative that the power distribution system has stabilized. The lighting loads are each controlled by a lighting control module, which is operable to wait for a predetermined amount of time for the startup sequence to begin before turning on the lighting loads.
摘要:
Power distribution systems that have a limited peak power capability or a high source impedance, such as site supply generators, are often susceptible to abnormal operation in response to the current drawn at power up from the loads connected to the power distribution system. The present invention provides a method of configuring a lighting control system to power up a plurality of the lighting loads in sequence to reduce stress on the power distribution system. The lighting control system includes a plurality of load control devices for controlling the electrical loads. The method comprising the steps of enabling a startup-delay mode in the load control devices, and determining a startup sequence having a plurality of event times for the electrical loads to turn on after the power distribution system has stabilized. A graphical user interface may be used to create a database defining the operation of the startup sequence.
摘要:
Power distribution systems that have a limited peak power capability or a high source impedance, such as site supply generators, are often susceptible to abnormal operation in response to the current drawn at power up from the loads connected to the power distribution system. The present invention provides a load control module for a lighting control system operable to start up a plurality of the lighting loads in sequence to reduce stress on the power distribution system. The lighting loads are each turned on as part of a startup sequence at predetermined times after an output voltage of the power distribution system has stabilized. The lighting control module is operable to wait for a predetermined amount of time for the startup sequence to begin before turning on the lighting loads.
摘要:
Power distribution systems that have a limited peak power capability or a high source impedance, such as site supply generators, are often susceptible to abnormal operation in response to the current drawn at power up from the loads connected to the power distribution system. The present invention provides a method of configuring a lighting control system to power up a plurality of the lighting loads in sequence to reduce stress on the power distribution system. The lighting control system includes a plurality of load control devices for controlling the electrical loads. The method comprising the steps of enabling a startup-delay mode in the load control devices, and determining a startup sequence having a plurality of event times for the electrical loads to turn on after the power distribution system has stabilized. A graphical user interface may be used to create a database defining the operation of the startup sequence.