Hinged structure and method of integration in a standard ski construction
    1.
    发明授权
    Hinged structure and method of integration in a standard ski construction 失效
    铰链结构和一体化标准滑雪建筑的方法

    公开(公告)号:US5044044A

    公开(公告)日:1991-09-03

    申请号:US264599

    申请日:1988-10-31

    IPC分类号: A63C5/02 E05D3/06

    摘要: A hinged structure comprises a forward body and a rear body each having a surface face and a channel. A first hinge link and a second hinge link are employed to pivotably and slideably connect the forward body and the rear body and to provide movement of the bodies between an open position and a closed position. The first hinge link has a fixed end pivotably affixed to the forward body and a sliding end pivotably and slideably affixed to the rear body. The second hinge link has a fixed end pivotably affixed to the rear body and a sliding end pivotably and slideably affixed to the forward body. The sliding ends of the hinge links are pivotably and slideably affixed to their respective bodies by a pin engaging a hinge slide fitted within the channel of the respective body. Means can be used to secure the rear body to the forward body when the hinge is in the closed position. The hinge structure is integrated into a standard ski construction by mechanically fastening a shear plate to the forward and rear bodies, and integrally laminating the shear plates to the ski.

    摘要翻译: 铰链结构包括前体和后体,每个具有表面和通道。 使用第一铰链连杆和第二铰链连接件可枢转地且可滑动地连接前主体和后体,并且提供主体在打开位置和关闭位置之间的运动。 第一铰链连接件具有可枢转地固定到前主体的固定端和可枢转地并可滑动地固定到后体的滑动端。 第二铰链连杆具有可枢转地固定到后体的固定端和可枢转地并可滑动地固定到前身的滑动端。 铰链连接件的滑动端部通过一个销枢接并可滑动地固定到它们各自的主体上,该销接合安装在相应主体通道内的铰链滑块。 当铰链处于关闭位置时,装置可用于将后体固定到前身上。 铰链结构通过将剪切板机械地紧固到前部和后部主体上并将剪切板整体地层压到滑雪板而被集成到标准滑雪结构中。