摘要:
A timeline is generated from and fully integrated with a project schedule. The project schedule may be any graphical representation for displaying detailed information associated with a project. The timeline visually represents certain tasks, dates and other information associated with the project schedule such that an overview of the project schedule may be determined.
摘要:
A therapeutic sandal is provided that includes an upper component having a front strap assembly and a rear strap assembly for securing a foot to the upper component, and a lower component, cooperative with the upper component, having at least one fulcrum object attached to the bottom surface of the lower component. The lower component is replaceable with another lower component with at least one different fulcrum object attached thereto. The lower component has at least one or two compressible fulcrum objects thereto. The lower component can also have at least one substantially non-compressible fulcrum object attached to the bottom surface. The invention provides a means for effectively exercising different muscle groups of the legs. The therapeutic sandals can be advantageously used by young children, in part due to the element of novelty and fun provided by wearing and using them, thereby encouraging a child to continue their use.