METHOD FOR CONVERTING A BALLASTED TRACK INTO A SLAB TRACK
    1.
    发明申请
    METHOD FOR CONVERTING A BALLASTED TRACK INTO A SLAB TRACK 有权
    一种用于将捆绑的轨道转换成SLAB轨迹的方法

    公开(公告)号:US20140158785A1

    公开(公告)日:2014-06-12

    申请号:US14087093

    申请日:2013-11-22

    IPC分类号: E01B29/00 E01B29/06 E01B27/04

    摘要: In a section of a ballasted track that extends over a plurality of crossties, ballast is removed and crossties are removed. Crosstie blocks mounted in concrete slabs are inserted, lifted, and fastened to the rails. The rails are supported by temporary, vertically adjustable supports and adjusted. In an area that extends over a number of concrete slabs, infill concrete is filled in from the underground up to at least part of the height of the concrete slabs, and after the infill concrete has hardened, at least a part of each of the supports located between two respective concrete slabs is removed. The method allows the conversion to be carried out without changing the position of the rails. After the placement of the supports, the track is immediately operable again so that the relevant section need not remain closed until all method steps are completed.

    摘要翻译: 在多个交叉点上延伸的压载轨道的一部分中,去除了镇流器,并且去除了交叉点。 安装在混凝土板中的交叉块被插入,提升并固定在轨道上。 轨道由临时的,可垂直调节的支撑支撑并进行调整。 在多个混凝土板上延伸的区域中,填充混凝土从地下填充到混凝土板的高度的至少一部分,并且在填充混凝土硬化之后,每个支撑件的至少一部分 位于两个相应的混凝土板之间。 该方法允许在不改变轨道的位置的情况下进行转换。 在放置支架之后,轨迹可立即重新进行操作,因此相关部分不需要保持关闭,直到所有方法步骤完成。

    Method for converting a ballasted track into a slab track
    2.
    发明授权
    Method for converting a ballasted track into a slab track 有权
    将压载轨道转换成板轨道的方法

    公开(公告)号:US09260821B2

    公开(公告)日:2016-02-16

    申请号:US14087093

    申请日:2013-11-22

    摘要: In a section of a ballasted track that extends over a plurality of crossties, ballast is removed and crossties are removed. Crosstie blocks mounted in concrete slabs are inserted, lifted, and fastened to the rails. The rails are supported by temporary, vertically adjustable supports and adjusted. In an area that extends over a number of concrete slabs, infill concrete is filled in from the underground up to at least part of the height of the concrete slabs, and after the infill concrete has hardened, at least a part of each of the supports located between two respective concrete slabs is removed. The method allows the conversion to be carried out without changing the position of the rails. After the placement of the supports, the track is immediately operable again so that the relevant section need not remain closed until all method steps are completed.

    摘要翻译: 在多个交叉点上延伸的压载轨道的一部分中,去除了镇流器,并且去除了交叉点。 安装在混凝土板中的交叉块被插入,提升并固定在轨道上。 轨道由临时的,可垂直调节的支撑支撑并进行调整。 在多个混凝土板上延伸的区域中,填充混凝土从地下填充至混凝土板的高度的至少一部分,并且在填充混凝土硬化之后,每个支撑件的至少一部分 位于两个相应的混凝土板之间。 该方法允许在不改变轨道的位置的情况下进行转换。 在放置支架之后,轨迹可立即重新进行操作,因此相关部分不需要保持关闭,直到所有方法步骤完成。