-
1.
公开(公告)号:US20100218046A1
公开(公告)日:2010-08-26
申请号:US12703917
申请日:2010-02-11
Applicant: Klaus Lamberg , Christine Thiessen , Matthias Schnelte
Inventor: Klaus Lamberg , Christine Thiessen , Matthias Schnelte
IPC: G06F11/28
CPC classification number: G05B23/0256 , G05B17/02
Abstract: A method is described and represented for testing a control apparatus with a test device, where the control apparatus has at least one state variable and at least one actual functionality that contains a time dependency, and the control apparatus and the test device are connected to each other via a signal interface.The problem of the present invention is to prevent—at least partially—the disadvantages known from the state of the art, and, particularly, to provide a method for testing a control apparatus, which allows as simple and flexible an acquisition of the target functionality of a control apparatus is possible, and which takes into account the time dependency of the target functionality as comprehensively as possible during the test case generation.
Abstract translation: 描述和表示用于测试具有测试装置的控制装置的方法,其中控制装置具有至少一个状态变量和至少一个包含时间依赖性的实际功能,并且控制装置和测试装置连接到每个 其他通过信号接口。 本发明的问题在于至少部分地防止现有技术中已知的缺点,特别是提供一种用于测试控制装置的方法,其允许简单和灵活地获取目标功能 的控制装置是可能的,并且在测试用例生成期间尽可能全面地考虑目标功能的时间依赖性。
-
2.
公开(公告)号:US08214690B2
公开(公告)日:2012-07-03
申请号:US12703917
申请日:2010-02-11
Applicant: Klaus Lamberg , Christine Thiessen , Matthias Schnelte
Inventor: Klaus Lamberg , Christine Thiessen , Matthias Schnelte
IPC: G06F11/00
CPC classification number: G05B23/0256 , G05B17/02
Abstract: A method is described and represented for testing a control apparatus with a test device, where the control apparatus has at least one state variable and at least one actual functionality that contains a time dependency, and the control apparatus and the test device are connected to each other via a signal interface.The problem of the present invention is to prevent—at least partially—the disadvantages known from the state of the art, and, particularly, to provide a method for testing a control apparatus, which allows as simple and flexible an acquisition of the target functionality of a control apparatus is possible, and which takes into account the time dependency of the target functionality as comprehensively as possible during the test case generation.
Abstract translation: 描述和表示用于测试具有测试装置的控制装置的方法,其中控制装置具有至少一个状态变量和至少一个包含时间依赖性的实际功能,并且控制装置和测试装置连接到每个 其他通过信号接口。 本发明的问题在于至少部分地防止现有技术中已知的缺点,特别是提供一种用于测试控制装置的方法,其允许简单和灵活地获取目标功能 的控制装置是可能的,并且在测试用例生成期间尽可能全面地考虑目标功能的时间依赖性。
-