-
公开(公告)号:US20080092100A1
公开(公告)日:2008-04-17
申请号:US11811407
申请日:2007-06-11
申请人: Robert L. Maziasz , Vladimir P. Rozenfeld , Iouri Smirnov , Sergei V. Somov , Igor G. Topouzov , Lyudmila Zinchenko
发明人: Robert L. Maziasz , Vladimir P. Rozenfeld , Iouri Smirnov , Sergei V. Somov , Igor G. Topouzov , Lyudmila Zinchenko
IPC分类号: G06F17/50
CPC分类号: G06F17/5077
摘要: A method, data processing system, and computer program product are provided for routing a circuit placement a number of times, resulting in a number of routings. An electromigration quality value is computed for each of the routings, and the routing with the best electromigration quality value is selected. In one embodiment, each routing is analyzed with attention to the current that passes through each of the routing's segments in order to compute a current distribution that is used to compute a routing quality vector. In another embodiment, multiple placements are generated and the electromigration placement quality vectors are computed for the various placements with the placement with the best electromigration quality vector being selected. In one embodiment, the placement with the best electromigration quality vector is routed the number of times to determine the routing with the lowest (best) electromigration quality value.
摘要翻译: 提供了一种方法,数据处理系统和计算机程序产品,用于多次路由电路布局,导致多个路由。 为每个路由计算电迁移质量值,并选择具有最佳电迁移质量值的路由。 在一个实施例中,分析每个路由,注意通过每个路由段的电流,以便计算用于计算路由质量向量的当前分布。 在另一个实施例中,生成多个布局,并且针对具有选择了最佳电迁移质量向量的位置的各种布局来计算电迁移放置质量向量。 在一个实施例中,具有最佳电迁移质量矢量的布置被路由多次以确定具有最低(最佳)电迁移质量值的路由。
-
公开(公告)号:US07721245B2
公开(公告)日:2010-05-18
申请号:US11811407
申请日:2007-06-11
申请人: Robert L. Maziasz , Vladimir P. Rozenfeld , Iouri Smirnov , Sergei V. Somov , Igor G. Topouzov , Lyudmila Zinchenko
发明人: Robert L. Maziasz , Vladimir P. Rozenfeld , Iouri Smirnov , Sergei V. Somov , Igor G. Topouzov , Lyudmila Zinchenko
IPC分类号: G06F17/50
CPC分类号: G06F17/5077
摘要: A method, data processing system, and computer program product are provided for routing a circuit placement a number of times, resulting in a number of routings. An electromigration quality value is computed for each of the routings, and the routing with the best electromigration quality value is selected. In one embodiment, each routing is analyzed with attention to the current that passes through each of the routing's segments in order to compute a current distribution that is used to compute a routing quality vector. In another embodiment, multiple placements are generated and the electromigration placement quality vectors are computed for the various placements with the placement with the best electromigration quality vector being selected. In one embodiment, the placement with the best electromigration quality vector is routed the number of times to determine the routing with the lowest (best) electromigration quality value.
摘要翻译: 提供了一种方法,数据处理系统和计算机程序产品,用于多次路由电路布局,导致多个路由。 为每个路由计算电迁移质量值,并选择具有最佳电迁移质量值的路由。 在一个实施例中,分析每个路由,注意通过每个路由段的电流,以便计算用于计算路由质量向量的当前分布。 在另一个实施例中,生成多个布局,并且针对具有选择了最佳电迁移质量向量的位置的各种布局来计算电迁移放置质量向量。 在一个实施例中,具有最佳电迁移质量矢量的布置被路由多次以确定具有最低(最佳)电迁移质量值的路由。
-