Device removing/re-inserting structure, and device removing/re-inserting method for construction machine
    1.
    发明授权
    Device removing/re-inserting structure, and device removing/re-inserting method for construction machine 失效
    设备拆卸/重新插入结构,以及施工机械的拆卸/重新插入方法

    公开(公告)号:US08382198B2

    公开(公告)日:2013-02-26

    申请号:US13216526

    申请日:2011-08-24

    IPC分类号: B62D25/24

    CPC分类号: E02F9/0883 E02F9/0833

    摘要: A demountable pillar 16 is demountably mounted to an upper frame bottom plate 9 and a floor plate 10. A spacer 35 is detachably attached to the demountable pillar 16. The spacer 35 is detached in a state that an upper load is supported by a lifting bolt 39 to reduce the height of the demountable pillar 16, and the demountable pillar 16 is demounted in a state that the upper load is supported by the other pillars. A fuel tank 11 as a device is removed from between the upper frame bottom plate 9 and the floor plate 10 in this state.

    摘要翻译: 可拆卸支柱16可拆卸地安装到上框架底板9和底板10.间隔件35可拆卸地附接到可拆卸支柱16.隔离件35在上部负载由提升螺栓支撑的状态下拆卸 以减少可拆卸支柱16的高度,并且可拆卸支柱16在上部负载被其他支柱支撑的状态下拆卸。 在这种状态下,作为装置的燃料箱11从上框架底板9和地板10之间移除。

    DEVICE REMOVING/RE-INSERTING STRUCTURE, AND DEVICE REMOVING/RE-INSERTING METHOD FOR CONSTRUCTION MACHINE
    2.
    发明申请
    DEVICE REMOVING/RE-INSERTING STRUCTURE, AND DEVICE REMOVING/RE-INSERTING METHOD FOR CONSTRUCTION MACHINE 失效
    装置拆卸/重新插入结构,以及建筑机械拆卸/重新插入方法

    公开(公告)号:US20120061995A1

    公开(公告)日:2012-03-15

    申请号:US13216526

    申请日:2011-08-24

    IPC分类号: B62D25/00

    CPC分类号: E02F9/0883 E02F9/0833

    摘要: A demountable pillar 16 is demountably mounted to an upper frame bottom plate 9 and a floor plate 10. A spacer 35 is detachably attached to the demountable pillar 16. The spacer 35 is detached in a state that an upper load is supported by a lifting bolt 39 to reduce the height of the demountable pillar 16, and the demountable pillar 16 is demounted in a state that the upper load is supported by the other pillars. A fuel tank 11 as a device is removed from between the upper frame bottom plate 9 and the floor plate 10 in this state.

    摘要翻译: 可拆卸支柱16可拆卸地安装到上框架底板9和底板10.间隔件35可拆卸地附接到可拆卸支柱16.隔离件35在上部负载由提升螺栓支撑的状态下拆卸 以减少可拆卸支柱16的高度,并且可拆卸支柱16在上部负载被其他支柱支撑的状态下拆卸。 在这种状态下,作为装置的燃料箱11从上框架底板9和地板10之间移除。

    PILLAR STRUCTURE FOR CONSTRUCTION MACHINE
    3.
    发明申请
    PILLAR STRUCTURE FOR CONSTRUCTION MACHINE 审中-公开
    建筑机械支柱结构

    公开(公告)号:US20120061994A1

    公开(公告)日:2012-03-15

    申请号:US13216372

    申请日:2011-08-24

    IPC分类号: B62D25/00

    CPC分类号: E02F9/0808 E02F9/0883

    摘要: In a structure where a floor plate (10) is mounted above a bottom plate (9) of an upper frame while being supported by a plurality of pillars, a left-rear pillar (16) required to be demounted and re-mounted, among the plurality of pillars, is provided with a spacer (35) adapted to increase a height dimension of the pillar (16), and a combination of a screw hole and a bolt (39) which serve as screw unit adapted to support a load to be applied to the spacer (35), in place of the spacer (35). Under a condition that the load is supported by the screw unit, the spacer (35) is detached to reduce the height dimension of the pillar (16). Then, under a condition that the load is supported by the remaining pillars, the left-rear pillar (16) is demounted.

    摘要翻译: 在将底板(10)安装在上框架的底板(9)上方同时被多个支柱支撑的结构中,需要拆卸并重新安装的左后支柱(16),其中 所述多个支柱设置有适于增加所述支柱(16)的高度尺寸的间隔件(35),以及螺钉孔和螺栓(39)的组合,所述螺钉孔和螺栓(39)用作用于将负载支撑到 施加到间隔件(35)上以代替间隔件(35)。 在负载由螺钉单元支撑的情况下,隔离件(35)被拆卸以减小支柱(16)的高度尺寸。 然后,在负载由剩余的支柱支撑的状态下,卸下左后柱(16)。