-
公开(公告)号:US20090133987A1
公开(公告)日:2009-05-28
申请号:US12242642
申请日:2008-09-30
Applicant: Terry Dirk , Paul Frederick MacDougall
Inventor: Terry Dirk , Paul Frederick MacDougall
Abstract: A method and process line apparatus for processing a sized ore feed excavated from an ore deposit is disclosed. The method involves disposing a processing apparatus in a processing apparatus position relative to the ore deposit, and disposing a first mobile conveyor to receive a sized ore feed at a receiving location located along a length of the first mobile conveyor. The first mobile conveyor is operable to convey the sized ore from the receiving location to a discharge end of the first mobile conveyor. The method also involves disposing a second mobile conveyor to receive the sized ore from the discharge end of the first mobile conveyor at a transfer location along a length of the second mobile conveyor and to convey the sized ore from the transfer location to the processing apparatus. The first and second mobile conveyors are oriented at an operational angle between a length of the first mobile conveyor and a length of the second mobile conveyor. The method further involves moving at least one of the first and second mobile conveyors to vary at least one of the operational angle and the transfer location to permit successive portions of the ore deposit within operational reach of the receiving location to be received for conveying along the first and second mobile conveyors to the processing apparatus while the processing apparatus is located in the processing apparatus position.
Abstract translation: 公开了一种用于处理从矿床挖掘的大型矿石进料的方法和处理线设备。 该方法包括将处理设备布置在相对于矿床的处理设备位置,并且设置第一移动式输送机以在沿着第一移动式输送机的长度定位的接收位置处接收尺寸的矿石进料。 第一移动输送机可操作以将尺寸的矿石从接收位置输送到第一移动输送机的排出端。 该方法还涉及设置第二移动式输送机以沿着第二移动输送机的长度在转移位置处从第一移动式输送机的排出端接收尺寸的矿石,并将大小的矿石从转移位置输送到处理设备。 第一和第二移动式输送机在第一移动式输送机的长度与第二移动输送机的长度之间的操作角度定向。 该方法还包括移动第一和第二可移动输送机中的至少一个以改变操作角度和转移位置中的至少一个,以允许接收位置的操作范围内的矿石的连续部分被接收用于沿着 第一和第二移动式输送机在处理装置位于处理装置位置时到达处理装置。
-
2.
公开(公告)号:US08317116B2
公开(公告)日:2012-11-27
申请号:US12242642
申请日:2008-09-30
Applicant: Terry Dirk , Paul Frederick MacDougall
Inventor: Terry Dirk , Paul Frederick MacDougall
IPC: B02C21/02
Abstract: A method and process line apparatus for processing a sized ore feed excavated from an ore deposit is disclosed. The method involves disposing a processing apparatus in a processing apparatus position relative to the ore deposit, and disposing a first mobile conveyor to receive a sized ore feed at a receiving location located along a length of the first mobile conveyor. The first mobile conveyor is operable to convey the sized ore from the receiving location to a discharge end of the first mobile conveyor. The method also involves disposing a second mobile conveyor to receive the sized ore from the discharge end of the first mobile conveyor at a transfer location along a length of the second mobile conveyor and to convey the sized ore from the transfer location to the processing apparatus. The first and second mobile conveyors are oriented at an operational angle between a length of the first mobile conveyor and a length of the second mobile conveyor. The method further involves moving at least one of the first and second mobile conveyors to vary at least one of the operational angle and the transfer location to permit successive portions of the ore deposit within operational reach of the receiving location to be received for conveying along the first and second mobile conveyors to the processing apparatus while the processing apparatus is located in the processing apparatus position.
Abstract translation: 公开了一种用于处理从矿床挖掘的大型矿石进料的方法和处理线设备。 该方法包括将处理设备布置在相对于矿床的处理设备位置,并且设置第一移动式输送机以在沿着第一移动式输送机的长度定位的接收位置处接收尺寸的矿石进料。 第一移动输送机可操作以将尺寸的矿石从接收位置输送到第一移动输送机的排出端。 该方法还涉及设置第二移动式输送机以沿着第二移动输送机的长度在转移位置处从第一移动式输送机的排出端接收尺寸的矿石,并将大小的矿石从转移位置输送到处理装置。 第一和第二移动式输送机在第一移动式输送机的长度与第二移动式输送机的长度之间的操作角度定向。 该方法还包括移动第一和第二可移动输送机中的至少一个以改变操作角度和转移位置中的至少一个,以允许接收位置的操作范围内的矿石的连续部分被接收用于沿着 第一和第二移动式输送机在处理装置位于处理装置位置时到达处理装置。
-