摘要:
A parts production scheduling method is provided for preparing, after receipt of a production order schedule of finished vehicles, a production order schedule of parts necessary for the production of the finished vehicles, wherein the production order schedule of the parts, which is divided into plural zones each equivalent to production of a predetermined number of consecutive products in the product order schedule of the higher products, is shifted so that it is ahead of the production order schedule of the higher products by one zone, thereafter, for each zone, parts to be produced on a parts production line are converted into corresponding pieces of parts identification information registered in advance, and the converted pieces of parts identification information are sorted by pre-registered inter-parts similarity information and collated with pre-registered part-by-part production order pattern information.
摘要:
A product quality information control method including the act of feeding repair information for making a repair based on imperfection information found during an inspection process of a product back to a manufacture control department. The repair information includes graphic and character information indicative of the contents of the repair made by a repair person. As a result, it becomes possible for the manufacture control department to accurately grasp an imperfection found by an inspection department and a temporary measure taken to cure the imperfection.
摘要:
A parts production scheduling method is provided for preparing, after receipt of a production order schedule of finished vehicles, a production order schedule of parts necessary for the production of the finished vehicles, wherein the production order schedule of the parts, which is divided into plural zones each equivalent to production of a predetermined number of consecutive products in the product order schedule of the higher products, is shifted so that it is ahead of the production order schedule of the higher products by one zone, thereafter, for each zone, parts to be produced on a parts production line are converted into corresponding pieces of parts identification information registered in advance, and the converted pieces of parts identification information are sorted by pre-registered inter-parts similarity information and collated with pre-registered part-by-part production order pattern information.