-
公开(公告)号:US3799358A
公开(公告)日:1974-03-26
申请号:US26158372
申请日:1972-06-12
申请人: ZACHRY CO H B
发明人: PUTNAM A
CPC分类号: B66C13/08
摘要: A helicopter tail rotor disposed on a crane for stabilizing a load suspended from the crane boom during a hoisting operation. The tail rotor is secured to a hoisting platform suspended from the upper end of the boom, the rotor blades being manually or automatically adjusted for turning the load horizontally in either direction such that the load is both stabilized during hoisting and easily directed to its assigned location. Alternately, the tail rotor is directly secured to the upper end of the boom such that the boom and crane body can be easily rotated about a fixed base, thereby avoiding the need for ring and pinion gears at the base of the crane, or reducing the load on such gears if they are used.
摘要翻译: 安装在起重机上的直升机尾部转子,用于在起重作业期间稳定悬挂起重机吊臂的载荷。 尾部转子被固定到从起重臂的上端悬挂的起重平台上,转动叶片被手动或自动地调节,以便在两个方向上水平地转动负载,使得负载在起重期间均稳定并且容易地被引导到其指定位置 。 或者,尾部转子直接固定在起重臂的上端,使得起重臂和起重机主体能够容易地围绕固定的基座旋转,从而避免了在起重机的底部需要环形和小齿轮,或者减少 如果使用这些齿轮,则会加载。
-
公开(公告)号:US3929241A
公开(公告)日:1975-12-30
申请号:US38683873
申请日:1973-08-08
申请人: ZACHRY CO H B
发明人: PUTNAM ALVIN A
CPC分类号: B60P3/40 , E04G21/161
摘要: A transport rig for moving a heavy load, such as a concrete modular building unit, includes a pair of load-carrying frames supporting the front and rear ends of the load. Front and rear hydraulic cylinders are secured between corresponding front and rear load-carrying frames and running gear at the front and rear, respectively, of the transport rig to support the load above the ground. An adjustable cable extends from one load-carrying frame to the other beneath the load and is drawn tight to secure the load-carrying frames together. The opposite ends of the cable are connected to a pair of power-operated winch drums on one loadcarrying frame, and the cable is reeved in a closed loop around guide means on the front and rear load-carrying frames. The winch drums can be power-operated to shorten the effective length of the cable and pull the load-carrying frames tightly against the front and rear ends of the load. The load is removed from the transport rig by contracting the front and rear hydraulic cylinders to lower the load-carrying frames to place the load on a foundation or the like. The load-carrying frames may be shifted laterally in either direction to properly position the load directly above the foundation before the load is finally placed on the foundation. The cable is then disabled so the loadcarrying frames can be separately removed from the ends of the load.
摘要翻译: 用于移动重负荷的运输装置,例如混凝土模块化建筑单元,包括一对支撑负载的前端和后端的承载框架。 前后液压缸分别固定在运输工具的前后负载框架和行走齿轮之间,以支撑地面以上的负载。 一个可调节的电缆从一个承载框架延伸到负载下的另一个承载框架,并被拉紧,以将承载框架固定在一起。 电缆的相对端连接到一个承载框架上的一对动力操作的绞盘鼓上,并且电缆围绕前后承载框架上的导向装置围绕闭环。 绞车鼓可以动力操作,以缩短电缆的有效长度,并将承载框架紧紧地压靠在负载的前端和后端。 通过使前后液压缸收缩以降低承载框架以将负载放置在基础等上,从运输工具卸载负载。 承载框架可以沿任一方向横向移动,以在负载最终放置在基础之前将负载正确地定位在地基的正上方。 然后电缆被禁用,因此承载框架可以从负载的端部分开移除。
-
公开(公告)号:US3908321A
公开(公告)日:1975-09-30
申请号:US37584273
申请日:1973-07-02
申请人: ZACHRY CO H B
CPC分类号: E04B1/34823
摘要: A pair of precast concrete building units are joined together to form a modular concrete house. Each concrete building unit includes a floor slab, upright load-bearing exterior walls joined with the perimeter of the floor slab, and a sloping roof cast integrally with the tops of the exterior walls. The building units are arranged so that the roof of each unit slopes upwardly toward the other unit, with the elevated ends of the roofs meeting to form an inverted V-shaped pitch roof. Interior walls are cast integrally with the exterior walls and the roof to divide the building units into separate rooms. The bottoms of the interior walls are spaced above the floor slab so that no loads are transmitted to the floor slab by the walls, and plumbing and wiring are run through the space between the bottom of the interior walls and the floor slab. A reinforcing cage formed from welded wire mesh is embedded in each exterior wall.
摘要翻译: 一对预制混凝土建筑单元连接在一起形成一个模块化混凝土房屋。 每个混凝土建筑单元包括一个地板,与地板周边连接的直立的承重外墙,以及与外墙的顶部一体地倾斜的屋顶。 建筑单元布置成使得每个单元的屋顶向上朝向另一个单元倾斜,屋顶的顶端会聚以形成倒V形的俯仰屋顶。 内墙与外墙和屋顶一体铸造,将建筑单元分成不同的房间。 内壁的底部在地板上方间隔开,使得墙壁不会将负载传递到楼板,并且管道和布线穿过内壁底部和地板之间的空间。 由焊接丝网形成的加强笼嵌入每个外墙。
-
公开(公告)号:US3904122A
公开(公告)日:1975-09-09
申请号:US42779373
申请日:1973-12-26
申请人: ZACHRY CO H B
发明人: SCHNITZER EMANUEL
CPC分类号: B05B3/001 , B01D1/222 , B01D1/2887 , B05B3/10 , Y02A20/128 , Y10S159/42
摘要: The rotary desalting device relates to a machine for purifying or concentrating fluids containing dissolved materials. The rotary desalting device of the present invention utilizes one or more high speed, thin rotating discs as heat transfer surfaces between a boiling and condensing fluid. The disc or discs are rotated at such high speed that the extreme centrifugal force of hundreds of times the force of gravity reduces the insulating water film to a micro-thin liquid film wherein greatly improved heat transfer coefficients are obtained. Provided in the rotating disc chamber housing is a centrifugal liquid seal to separate the boiling and condensing chambers which is combined with a naturally pressurized fluid discharge at the disc periphery. The rotary desalting engine of the present invention also incorporates other unique and novel components such as an easily cleanable tri-liquid counter-flow spiral heat exchanger and degasser devices to prevent dissolved gas from accumulating in and blocking the purifying system.
-
公开(公告)号:US3574404A
公开(公告)日:1971-04-13
申请号:US3574404D
申请日:1969-05-12
申请人: ZACHRY CO H B
发明人: HOGAN THOMAS J
CPC分类号: E02F5/323 , E02F3/8883
摘要: An improvement in an apparatus for creating repetitive explosions from an outlet of a combustion chamber by actuating a digging assembly by the explosive pressures to loosen and break up hard materials. The use of piston-driven digging teeth for loosening and breaking up material formations both prior to and simultaneously with material displacement by repetitive explosive blasts. An apparatus positioning locking assembly including a piston-driven pin actuated by the repetitive explosive blasts into position for holding the apparatus in position and which is actuated either prior to or simultaneously with the material displacement blasts and digging assembly actuation.
-
公开(公告)号:US3921713A
公开(公告)日:1975-11-25
申请号:US42779473
申请日:1973-12-26
申请人: ZACHRY CO H B
CPC分类号: F28D9/04 , Y10S165/398
摘要: A novel heat exchanger is formed by using alternating smooth and dimpled, thin, thermally conductive strips which are wound in a spiral to form the closed passageways for fluid between the strips and retain between an outer retaining and fluid distribution ring and an inner retaining and fluid distribution ring. The strips have means for sealing and insulating the periphery in a fluid tight manner. The dimpled strips have dimples extending from each side of the strip the size determining the fluid capacity of the passageways. The smooth and dimpled strips are used in pairs enabling two, four, etc., fluids to be passed either in concurrent or counter-current flow so as to provide an efficient heat exchanger which may be easily taken apart and cleaned for good service.
摘要翻译: 通过使用交替平滑和凹凸的薄导热条形成新颖的热交换器,所述条被卷绕成螺旋状,以形成用于条带之间的流体的封闭通道,并且保持在外部保持和流体分配环与内部保持和流体之间 配电环。 条具有用于以流体密封的方式密封和绝缘周边的装置。 凹陷条具有从条的每一侧延伸的尺寸确定通道的流体容量的尺寸的凹坑。 平滑和凹陷的条带成对使用,使得两个,四个等流体能够以同时或逆流流动,以便提供有效的热交换器,其可以容易地分离和清洁以获得良好的服务。
-
公开(公告)号:US3898776A
公开(公告)日:1975-08-12
申请号:US37584473
申请日:1973-07-02
申请人: ZACHRY CO H B
CPC分类号: E04B1/34823
摘要: A pair of precast concrete building units are joined together to form a modular concrete house. Each concrete building unit includes a floor slab, upright load-bearing exterior walls joined with the perimeter of the floor slab, and a sloping roof cast integrally with the tops of the exterior walls. The building units are arranged so that the roof of each unit slopes upwardly toward the other unit, with the elevated ends of the roofs meeting to form an inverted V-shaped pitch roof. Interior walls are cast integrally with the exterior walls and the roof to divide the building units into separate rooms. The bottoms of the interior walls are spaced above the floor slab so that no loads are transmitted to the floor slab by the walls, and plumbing and wiring are run through the space between the bottom of the interior walls and the floor slab. A reinforcing cage formed from welded wire mesh is embedded in each exterior wall.
摘要翻译: 一对预制混凝土建筑单元连接在一起形成一个模块化混凝土房屋。 每个混凝土建筑单元包括一个地板,与地板周边连接的直立的承重外墙,以及与外墙的顶部一体地倾斜的屋顶。 建筑单元布置成使得每个单元的屋顶向上朝向另一个单元倾斜,屋顶的顶端会聚以形成倒V形的俯仰屋顶。 内墙与外墙和屋顶一体铸造,将建筑单元分成不同的房间。 内壁的底部在地板上方间隔开,使得墙壁不会将负载传递到楼板,并且管道和布线穿过内壁底部和地板之间的空间。 由焊接丝网形成的加强笼嵌入每个外墙。
-
公开(公告)号:US3596417A
公开(公告)日:1971-08-03
申请号:US3596417D
申请日:1969-04-09
申请人: ZACHRY CO H B
发明人: ZACHRY HENRY B
CPC分类号: E04B1/34823 , E04B2001/34892
摘要: Concrete rooms, each having an integrally cast top segment, consisting of a top panel and three sidewalls, and a precast floor segment, secured to the top segment during its integral casting, are stacked on top of one another to form a rigid structure of multiple floors. The rear ends of the rooms have integrally cast cantilevered overhangs such that when the rear ends of two stacks of rooms are positioned adjacent one another the cantilevered overhangs form floors and ceilings for the corridors defined by the space between the stacks. Each stack of rooms consists of an alternating arrangement of long and short rooms, each short room having a locking ridge at its forward end for locking into an opening formed across the forward end of a corresponding longer room.
-
-
-
-
-
-
-