-
公开(公告)号:US20220220839A1
公开(公告)日:2022-07-14
申请号:US17144677
申请日:2021-01-08
Applicant: ARAMCO SERVICES COMPANY
Inventor: Hui-Hai Liu , Jilin Zhang , Huseyin Onur Balan , Feng Liang
IPC: E21B47/003 , E21B43/26
Abstract: A method for determining SRV and EUR includes: monitoring an amount and a density of a hydrocarbon fluid produced from the production well; obtaining a cumulative amount of the fluid that has accumulated from a beginning of production; obtaining a relationship between the cumulative amount and a square root of the time; determining a deviation point where the relationship changes from linear to non-linear; determining a deviation amount of the fluid corresponding to the deviation point; determining a first density of the hydrocarbon fluid at the beginning of production, a second density at a pore pressure equal to a bottom hole pressure in the production well, a first porosity at the beginning of production, and a second porosity for a pore pressure equal to the bottom hole pressure; and determining SRV and the EUR based on the deviation amount, the first and second densities, and the first and second porosities.
-
公开(公告)号:US11702924B2
公开(公告)日:2023-07-18
申请号:US17144677
申请日:2021-01-08
Applicant: ARAMCO SERVICES COMPANY
Inventor: Hui-Hai Liu , Jilin Zhang , Huseyin Onur Balan , Feng Liang
IPC: E21B43/26 , E21B47/003
CPC classification number: E21B47/003 , E21B43/26 , E21B2200/20
Abstract: A method for determining SRV and EUR includes: monitoring an amount and a density of a hydrocarbon fluid produced from the production well; obtaining a cumulative amount of the fluid that has accumulated from a beginning of production; obtaining a relationship between the cumulative amount and a square root of the time; determining a deviation point where the relationship changes from linear to non-linear; determining a deviation amount of the fluid corresponding to the deviation point; determining a first density of the hydrocarbon fluid at the beginning of production, a second density at a pore pressure equal to a bottom hole pressure in the production well, a first porosity at the beginning of production, and a second porosity for a pore pressure equal to the bottom hole pressure; and determining SRV and the EUR based on the deviation amount, the first and second densities, and the first and second porosities.
-