-
公开(公告)号:US4920276A
公开(公告)日:1990-04-24
申请号:US228023
申请日:1988-08-04
申请人: Akitaka Tateishi , Tadao Arakawa , Masaru Kurosawa , Yoshifumi Kubo , Yoji Nagai
发明人: Akitaka Tateishi , Tadao Arakawa , Masaru Kurosawa , Yoshifumi Kubo , Yoji Nagai
CPC分类号: F01K17/005 , Y02E20/14 , Y02E20/16
摘要: A heat-and-electricity supply system in which steam from a steam generator is utilized to supply an electric output and a heat output such a system includes: a steam turbine driven by the steam generated in the steam generator; a clutch with reduction gear, connected to a shaft of the steam turbine; a power generator for providing the electric output, connected to the clutch with a reduction gear; a clutch with a speed increasing gear, connected to a shaft of the power generator as occasion demands; a compressor connected to the clutch with speed increasing gear; a heat-side load utilizing a cooling medium or a heating medium supplied from the compressor.
摘要翻译: 一种热电供应系统,其中使用来自蒸汽发生器的蒸汽来提供电力输出和热输出,所述系统包括:由蒸汽发生器中产生的蒸汽驱动的蒸汽轮机; 具有减速齿轮的离合器,连接到蒸汽轮机的轴; 用于提供电输出的发电机,其与减速齿轮连接到离合器; 具有增速齿轮的离合器,根据需要连接到发电机的轴; 压缩机,其连接到具有增速齿轮的离合器; 利用从压缩机供给的冷却介质或加热介质的热侧负荷。
-
公开(公告)号:US07065968B2
公开(公告)日:2006-06-27
申请号:US10957710
申请日:2004-10-05
申请人: Masaki Takahashi , Yoshifumi Kubo , Akitaka Tateishi , Katsutoshi Higuma , Akio Umino , Yasuhiro Oda
发明人: Masaki Takahashi , Yoshifumi Kubo , Akitaka Tateishi , Katsutoshi Higuma , Akio Umino , Yasuhiro Oda
IPC分类号: F01K1/00
CPC分类号: F01D9/06 , F01D25/24 , F01K13/00 , F05D2230/70
摘要: In a steam turbine plant in which a turbine casing containing a turbine is constituted of an upper-half casing and a lower-half casing, nozzles are provided to the upper-half casing and a steam supplied through main steam piping lines are deliveried into the upper-half casing. Main steam pipes for supplying a steam from respective main valves to the respective nozzles are each formed so as to be dividable in a position out of the installation area of the upper-half casing.
摘要翻译: 在其中包含涡轮机的涡轮机壳体由上半壳体和下半壳体构成的蒸汽轮机设备中,在上半壳体上设置有喷嘴,并且通过主蒸汽管线输送的蒸汽被输送到 上半壳。 用于将主蒸汽的蒸汽供给到各个喷嘴的主蒸汽管各自形成为能够在上半壳体的安装区域外的位置分割。
-
公开(公告)号:US06536203B2
公开(公告)日:2003-03-25
申请号:US09941750
申请日:2001-08-30
IPC分类号: F02C618
摘要: A boiler installation supporting frame structure supported by a supporting structural body and a gas turbine frame base are constituted integrally, and a gas turbine device is disposed at upper portion of the integrated type frame structure and at the lower portion thereof a boiler installation is disposed in a three dimensional structure. Thereby, through the three dimensional arrangement of the gas turbine device and the boiler installation, the power generation installation can be disposed in a limited space.
-
公开(公告)号:US20060201155A1
公开(公告)日:2006-09-14
申请号:US11430010
申请日:2006-05-09
申请人: Masaki Takahashi , Yoshifumi Kubo , Akitaka Tateishi , Katsutoshi Higuma , Akio Umino , Yasuhiro Oda
发明人: Masaki Takahashi , Yoshifumi Kubo , Akitaka Tateishi , Katsutoshi Higuma , Akio Umino , Yasuhiro Oda
IPC分类号: F01K13/00
CPC分类号: F01D9/06 , F01D25/24 , F01K13/00 , F05D2230/70
摘要: In a steam turbine plant in which a turbine casing containing a turbine is constituted of an upper-half casing and a lower-half casing, nozzles are provided to the upper-half casing and a steam supplied through main steam piping lines are delivered into the upper-half casing. Main steam pipes for supplying a steam from respective main valves to the respective nozzles are each formed so as to be dividable in a position out of the installation area of the upper-half casing.
摘要翻译: 在其中包含涡轮机的涡轮壳体由上半壳体和下半壳体构成的蒸汽轮机设备中,在上半壳体上设置有喷嘴,并且通过主蒸汽管线输送的蒸汽被输送到 上半壳。 用于将主蒸汽的蒸汽供给到各个喷嘴的主蒸汽管各自形成为能够在上半壳体的安装区域外的位置分割。
-
公开(公告)号:US20050072157A1
公开(公告)日:2005-04-07
申请号:US10957710
申请日:2004-10-05
申请人: Masaki Takahashi , Yoshifumi Kubo , Akitaka Tateishi , Katsutoshi Higuma , Akio Umino , Yasuhiro Oda
发明人: Masaki Takahashi , Yoshifumi Kubo , Akitaka Tateishi , Katsutoshi Higuma , Akio Umino , Yasuhiro Oda
CPC分类号: F01D9/06 , F01D25/24 , F01K13/00 , F05D2230/70
摘要: In a steam turbine plant in which a turbine casing containing a turbine is constituted of an upper-half casing and a lower-half casing, nozzles are provided to the upper-half casing and a steam supplied through main steam piping lines are deliveried into the upper-half casing. Main steam pipes for supplying a steam from respective main valves to the respective nozzles are each formed so as to be dividable in a position out of the installation area of the upper-half casing.
摘要翻译: 在其中包含涡轮机的涡轮机壳体由上半壳体和下半壳体构成的蒸汽轮机设备中,在上半壳体上设置有喷嘴,并且通过主蒸汽管线输送的蒸汽被输送到 上半壳。 用于将主蒸汽的蒸汽供给到各个喷嘴的主蒸汽管各自形成为能够在上半壳体的安装区域外的位置分割。
-
公开(公告)号:US06250068B1
公开(公告)日:2001-06-26
申请号:US09356317
申请日:1999-07-16
IPC分类号: F02G100
摘要: According to the present invention, the shape of a passage in an intake-air duct communicated with the suction side of the intake-air filter is regulated so that snow is heaped up in the intake-air duct, and accordingly, the volume of snow reaching the intake-air filter is reduce in order to prevent the intake-air filter from clogging, and to prevent the flow rate of intake-air into a gas turbine from being lowered. In order to attain the above-mentioned purpose, there is provided, according to the present invention, an air-intake method for a gas turbine, in which intake-air 18 taken from a fresh air intake port is fed downward through a second intake-air duct in a substantially vertical direction, and then is fed in a substantially horizontal direction. Thereafter, dust is removed from the intake-air within an intake-air filter chamber, and then, is led into the gas turbine.
摘要翻译: 根据本发明,与进气滤清器的吸入侧连通的进气管道中的通道的形状被调节,使得在进气管道中堆积积雪,因此,积雪量 为了防止吸入空气过滤器堵塞,并且防止进入燃气轮机的进气流量降低,达到进气过滤器的速度降低。 为了实现上述目的,根据本发明,提供了一种用于燃气轮机的进气方法,其中从新鲜空气吸入口取入的进气18通过第二进气口向下供给 在大致垂直方向上的空气管道,然后沿基本上水平的方向进给。 此后,在进气空气过滤室内从吸入空气除去灰尘,然后被引入燃气轮机。
-
-
-
-
-