-
公开(公告)号:US5826387A
公开(公告)日:1998-10-27
申请号:US773053
申请日:1996-12-24
CPC分类号: E04H12/085 , E02D27/42 , E02D2200/12 , E02D2300/002 , E02D5/38
摘要: An upright cylindrical pier foundation is constructed of cementitious material. The lower end of the foundation has a plate or circumferential ring fully embedded therein and long circumferentially spaced rods or bolts have their lower ends anchored relative to the ring. The upper ends of the long rods project up outwardly of the top of the foundation. The rods are shielded over substantially their entire length against bonding with the cementitious material to allow the rods, when heavily tensioned, to stretch within the cementitious material. A heavy flange, which may comprise the base flange of a tubular tower, is positioned downwardly upon the upper end of the foundation with the upper ends of the bolts projecting through holes provided therefor in the base flange. Nuts are threaded downwardly upon the upper ends of the bolts and against the base flange under high torque in order to place the bolts in heavy tension and substantially the entire length of the cylindrical foundation under high unit compressive loading. The pier foundation may include a diametrically enlarged upper end shoulder portion whose outer peripheral portion includes additional circumferentiallv spaced heavily tensioned short rods anchored between a second anchor plate or ring embedded in the shoulder portion and a second flange or ring seated downwardly on the shoulder portion upper end. Also, the long rods may include shorter rod sections suitably coupled together and sections of the foundation may be precast with the sheathed rods in place.
摘要翻译: 直立的圆柱墩基础由水泥材料构成。 基座的下端具有完全嵌入其中的板或周向环,并且长周向间隔开的杆或螺栓的下端相对于环固定。 长杆的上端从基础的顶部向外突出。 杆基本上在其整个长度上被遮蔽以抵抗与水泥质材料的接合,以允许杆在严重张紧时在水泥质材料内拉伸。 可以包括管状塔架的基部凸缘的重的凸缘被定位在基座的上端的下方,螺栓的上端通过设在该凸缘中的孔突出。 螺母在螺栓的上端向下螺纹并且以高扭矩抵靠在基部凸缘上,以便在高的单位压缩载荷下将螺栓放置在重的张力和基本上整个圆柱形基座的整个长度上。 码头基础可以包括径向扩大的上端肩部,其外周部分包括锚定在嵌入在肩部中的第二锚定板或环之间的额外的周向间隔的重度张紧的短杆和位于肩部上方的下方的第二凸缘或环 结束。 此外,长杆可以包括适当地联接在一起的较短的杆部分,并且基础的部分可以在护套杆就位的情况下预制。
-
公开(公告)号:US5586417A
公开(公告)日:1996-12-24
申请号:US346935
申请日:1994-11-23
CPC分类号: E04H12/085 , E02D27/42 , E02D2200/12 , E02D2300/002 , E02D5/38
摘要: A hollow, cylindrical pier foundation is constructed of cementitious material poured in situ between inner and outer cylindrical corrugated metal pipe shells. The foundation is formed within a ground pit and externally and internally back filled. The lower end of the foundation has a circumferential ring fully embedded therein and sets of inner and outer circumferentially spaced bolts have their lower ends anchored to the anchor ring, their upper ends projecting up outwardly of the top of the foundation and a majority of the midportions thereof free of connection with the cementitious material of which the foundation is constructed. The base flange of a tubular tower is positioned downwardly upon the upper end of the foundation with the upper ends of the inner and outer sets of bolts projecting upwardly through holes provided therefor in the base flange and nuts are threaded downwardly upon the upper ends of the bolts and against the base flange. The nuts are highly torqued in order to place the bolts in heavy tension and to thus place substantially the entire length of the cylindrical foundation in heavy axial compression.
摘要翻译: 一个中空的圆柱形墩座基础由在内外圆柱形波纹金属管壳之间原位浇注的水泥质材料构成。 基础形成在地坑内,内部和内部填充。 基座的下端具有完全嵌入其中的周向环,并且内外周向间隔的螺栓的组具有其下端锚固到锚环,其上端从基座的顶部向外突出,并且大部分中部 其与构造基础的水泥质材料无连接。 管状塔架的基座法兰向下定位在地基的上端,内套螺栓和外套螺栓的上端向上突出,穿过底座法兰上的孔,螺母向下穿过 螺栓和基座法兰。 螺母被高度扭转,以便将螺栓放置在很大的张力下,从而基本上将圆柱形基座的整个长度大致地轴向压缩。
-