-
1.
公开(公告)号:US20170131337A1
公开(公告)日:2017-05-11
申请号:US15346128
申请日:2016-11-08
Applicant: Alstom Transport Technologies
Inventor: Davide Barlini , Donato-Carlo Loguercio
CPC classification number: G01R31/008 , B60L3/0023 , B60L5/045 , B60L5/24 , B60L2200/30 , B60M1/12 , G01R31/04 , G01R31/14 , G01R31/44
Abstract: A system for monitoring a pantograph of a railway vehicle, the pantograph being adapted to be connected to a catenary and electrically connected to a traction unit, the catenary being adapted to provide an alternating current to the railway vehicle, the system further including: a voltage step detection device for detecting a voltage step of a pantograph voltage at the pantograph, a zero crossing detection device for detecting a zero crossing of a line current, the line current being a portion of a pantograph current provided to the traction unit, the pantograph current being the current flowing through the pantograph; and a bouncing detection portion adapted to determine at least one bouncing time of the pantograph based on one or more detected voltage steps of the voltage step detection device and/or one or more detected zero crossings of the zero crossing detection device.
-
公开(公告)号:US10048303B2
公开(公告)日:2018-08-14
申请号:US15346128
申请日:2016-11-08
Applicant: Alstom Transport Technologies
Inventor: Davide Barlini , Donato-Carlo Loguercio
Abstract: A system for monitoring a pantograph of a railway vehicle, the pantograph being adapted to be connected to a catenary and electrically connected to a traction unit, the catenary being adapted to provide an alternating current to the railway vehicle, the system further including: a voltage step detection device for detecting a voltage step of a pantograph voltage at the pantograph, a zero crossing detection device for detecting a zero crossing of a line current, the line current being a portion of a pantograph current provided to the traction unit, the pantograph current being the current flowing through the pantograph; and a bouncing detection portion adapted to determine at least one bouncing time of the pantograph based on one or more detected voltage steps of the voltage step detection device and/or one or more detected zero crossings of the zero crossing detection device.
-