SYSTEMS AND METHODS FOR INFORMATION MANAGEMENT SYSTEM TRANSACTION SCHEDULING AS WAIT-FOR-INPUT OR PSEUDO-WAIT-FOR-INPUT

    公开(公告)号:US20230127920A1

    公开(公告)日:2023-04-27

    申请号:US17452398

    申请日:2021-10-26

    摘要: Systems and techniques for scheduling transactions as wait-for-input (WFI) or regions as pseudo-wait-for-input (P-WFI) include receiving a transaction report. The transactions from the transaction report are filtered using the plurality of metrics to generate a list of eligible WFI transactions or regions for running as P-WFI. The list of eligible WFI transactions or regions for running as P-WFI is filtered by applying a first system benchmark that is based on a total number of executed transactions to generate a list of top-eligible WFI transactions or regions for running as P-WFI. A total number of dedicated processing regions are calculated for each of the transactions on the list of top-eligible WFI transactions or regions for running as P-WFI. A scheduling report with a final list of top transactions eligible for scheduling as WFI or regions for running as P-WFI is generated based on the total number of dedicated processing regions.

    OPTIMIZING THE NUMBER OF IMS DEPENDENT REGIONS

    公开(公告)号:US20230132124A1

    公开(公告)日:2023-04-27

    申请号:US17657199

    申请日:2022-03-30

    摘要: System and techniques for determining an optimal number of regions in an IMS system include receiving a transaction report from a log dataset. A first table is generated from the transaction report, where the first table includes a class identified by a class identifier (ID), a number of regions the class is assigned, and a total percent region occupancy by the class. Classes ineligible to be shut down are identified based on a set of criteria and the classes ineligible to be shut down are eliminated. For each remaining class assigned to a threshold number of regions, candidate regions from the threshold number of regions eligible for shut down are identified and remaining regions from the threshold number of regions that can handle a workload from the candidate regions eligible for shut down are identified, where the remaining regions represent the optimal number of regions in the IMS system.