-
公开(公告)号:US20130289966A1
公开(公告)日:2013-10-31
申请号:US13575342
申请日:2001-08-18
IPC分类号: G06F17/50
CPC分类号: G06F17/5009 , G06F17/509 , G06F2217/36 , H04L41/145
摘要: A system and method of designing a fibre optic network for a plurality of premises in a geographic area that has existing infrastructure is described. They include electronically receiving fibre optic network design inputs that include data indicative of a plurality of nodes in the fibre optic network and data indicative of arcs extending between said nodes in the fibre optic network based on allocated bandwidth for said premises in the geographic area, electronically receiving existing infrastructure design inputs comprising data indicative of said existing infrastructure that can be used as geographic locations for said nodes and said arcs in the fibre optic network, electronically generating design outputs by optimising geographic locations of said nodes and said arcs in the fibre optic network using said fibre optic network design inputs and said existing infrastructure inputs, and electronically outputting the design outputs.
摘要翻译: 描述了在具有现有基础设施的地理区域中为多个房屋设计光纤网络的系统和方法。 它们包括电子地接收光纤网络设计输入,其包括指示光纤网络中的多个节点的数据,以及指示在光纤网络中的所述节点之间延伸的弧的数据,基于所述地理区域中的所述房屋的分配带宽,电子地 接收现有的基础设施设计输入,包括指示所述现有基础设施的数据,所述现有基础设施可以用作光纤网络中的所述节点和所述弧的地理位置,通过优化所述节点和所述光纤网络中的所述弧的地理位置来电子地生成设计输出 使用所述光纤网络设计输入和所述现有基础结构输入,并且电子地输出所述设计输出。
-
2.
公开(公告)号:US08572001B2
公开(公告)日:2013-10-29
申请号:US12099327
申请日:2008-04-08
CPC分类号: G06Q10/06 , G06Q10/06315
摘要: A method for generating a transportation plan. A set of transportation requests are identified. An initial transportation plan having a set of vehicle routes, a set of vehicle schedules, and a set of crew schedules that satisfy the set of transportation requests is created. A set of vehicle routes, a set of vehicle schedules, and a set of crew schedules are simultaneously modified repeatedly using a policy to generate a new transportation plan until an objective is met.
摘要翻译: 一种生成运输计划的方法。 确定一组运输请求。 创建具有一组车辆路线,一组车辆时刻表和满足一组运输请求的一组船员表的初始运输计划。 一套车辆路线,一组车辆时间表以及一组船员时间表同时通过政策重新进行修改,以生成新的交通计划,直到满足目标。
-
公开(公告)号:US09323872B2
公开(公告)日:2016-04-26
申请号:US13575342
申请日:2011-08-18
CPC分类号: G06F17/5009 , G06F17/509 , G06F2217/36 , H04L41/145
摘要: A system and method of designing a fiber optic network for a plurality of premises in a geographic area that has existing infrastructure is described. They include electronically receiving fiber optic network design inputs that include data indicative of a plurality of nodes in the fiber optic network and data indicative of arcs extending between said nodes in the fiber optic network based on allocated bandwidth for said premises in the geographic area, electronically receiving existing infrastructure design inputs comprising data indicative of said existing infrastructure that can be used as geographic locations for said nodes and said arcs in the fiber optic network, electronically generating design outputs by optimizing geographic locations of said nodes and said arcs in the fiber optic network using said fiber optic network design inputs and said existing infrastructure inputs, and electronically outputting the design outputs.
摘要翻译: 描述了在具有现有基础设施的地理区域中为多个房屋设计光纤网络的系统和方法。 它们包括电子地接收光纤网络设计输入,其包括指示光纤网络中的多个节点的数据,以及指示在光纤网络中的所述节点之间延伸的弧的数据,基于所述地理区域中的所述房屋的分配带宽,电子地 接收现有的基础设施设计输入,包括指示所述现有基础设施的数据,所述现有基础设施可以用作光纤网络中的所述节点和所述弧的地理位置,通过优化所述节点和所述光纤网络中的所述弧的地理位置来电子地生成设计输出 使用所述光纤网络设计输入和所述现有基础结构输入,并且电子地输出所述设计输出。
-
4.
公开(公告)号:US20090254405A1
公开(公告)日:2009-10-08
申请号:US12099327
申请日:2008-04-08
IPC分类号: G06Q10/00
CPC分类号: G06Q10/06 , G06Q10/06315
摘要: A method for generating a transportation plan. A set of transportation requests are identified. An initial transportation plan having a set of vehicle routes, a set of vehicle schedules, and a set of crew schedules that satisfy the set of transportation requests is created. A set of vehicle routes, a set of vehicle schedules, and a set of crew schedules are simultaneously modified repeatedly using a policy to generate a new transportation plan until an objective is met.
摘要翻译: 一种生成运输计划的方法。 确定一组运输请求。 创建具有一组车辆路线,一组车辆时刻表和满足一组运输请求的一组船员表的初始运输计划。 一套车辆路线,一组车辆时间表以及一组船员时间表同时通过政策重新进行修改,以生成新的交通计划,直到满足目标。
-
-
-