公开(公告)号:US20160046459A1
公开(公告)日:2016-02-18
申请号:US14927234
申请日:2015-10-29
CPC分类号: B65H35/06 , B26D1/085 , B26D5/28 , B26D7/08 , B65H43/00 , B65H2220/09 , B65H2301/51212 , B65H2404/14 , B65H2511/51 , B65H2513/10 , B65H2513/108 , B65H2513/40 , B65H2801/06 , Y10T83/0405 , Y10T83/2022 , Y10T83/4529 , B65H2220/01 , B65H2220/02
摘要: A sheet is cut between a first conveying unit and a second conveying unit in a state in which the first and second conveying units halt and in which an upstream conveying unit conveys the sheet at a first speed; after the sheet is cut, the first conveying unit conveys the sheet at a second speed higher than the first speed to reduce a slack formed during the halting; after the sheet is cut, the second conveying unit conveys the downstream-side sheet at a third speed higher than the first speed; if the third conveying unit is nipping the sheet during cutting, the third conveying unit conveys the sheet at the third speed; and if the third conveying unit is not nipping the sheet, the third conveying unit conveys the sheet at the third speed or a fourth speed after the detecting unit detects the sheet.
摘要翻译: 在第一和第二输送单元停止的状态下,在第一输送单元和第二输送单元之间切割片材,其中上游输送单元以第一速度输送片材; 在片材被切割之后,第一输送单元以比第一速度高的第二速度输送片材以减少在停止期间形成的松弛; 在片材被切割之后,第二传送单元以比第一速度高的第三速度传送下游侧片材; 如果第三输送单元在切割期间夹住纸张,则第三输送单元以第三速度输送纸张; 并且如果第三传送单元不夹住纸张,则在检测单元检测到纸张之后,第三传送单元以第三速度或第四速度传送纸张。
-
公开(公告)号:US09896298B2
公开(公告)日:2018-02-20
申请号:US14927234
申请日:2015-10-29
CPC分类号: B65H35/06 , B26D1/085 , B26D5/28 , B26D7/08 , B65H43/00 , B65H2220/09 , B65H2301/51212 , B65H2404/14 , B65H2511/51 , B65H2513/10 , B65H2513/108 , B65H2513/40 , B65H2801/06 , Y10T83/0405 , Y10T83/2022 , Y10T83/4529 , B65H2220/01 , B65H2220/02
摘要: A sheet is cut between a first conveying unit and a second conveying unit in a state in which the first and second conveying units halt and in which an upstream conveying unit conveys the sheet at a first speed; after the sheet is cut, the first conveying unit conveys the sheet at a second speed higher than the first speed to reduce a slack formed during the halting; after the sheet is cut, the second conveying unit conveys the downstream-side sheet at a third speed higher than the first speed; if the third conveying unit is nipping the sheet during cutting, the third conveying unit conveys the sheet at the third speed; and if the third conveying unit is not nipping the sheet, the third conveying unit conveys the sheet at the third speed or a fourth speed after the detecting unit detects the sheet.
-