-
公开(公告)号:US20150136389A1
公开(公告)日:2015-05-21
申请号:US14526684
申请日:2014-10-29
Applicant: CONOCOPHILLIPS COMPANY
Inventor: Patrick W. BERGMAN
CPC classification number: E21B43/121 , E21B2041/0028 , F04B47/12
Abstract: A logic used to auto-adjust plunger lift system parameters to optimize oil and gas well production with minimal human interaction is described. The auto-adjustments place and maintain the well in an optimized state wherein the well has either a Minimum-OFF time (e.g., length of time just long enough for the plunger to reach the bottom of the well), or Minimum-ON time (e.g., flowing just long enough for the plunger to reach the surface) cycle.
Abstract translation: 描述了一种用于自动调节柱塞提升系统参数以最小化人类相互作用来优化油气井生产的逻辑。 自动调节将井保持在优化状态,其中井具有最小关闭时间(例如,足够长的时间足以使柱塞到达井的底部)或最小接通时间( 例如,流动足够长以使柱塞到达表面)循环。
-
2.
公开(公告)号:US20140102698A1
公开(公告)日:2014-04-17
申请号:US14027596
申请日:2013-09-16
Applicant: CONOCOPHILLIPS COMPANY
Inventor: Patrick W. BERGMAN
IPC: E21B47/09
CPC classification number: E21B47/09 , E21B43/121
Abstract: A method for determining when a plunger reaches the bottom of an oil or gas well equipped with a plunger lift system. More particularly, the method identifies a surface pressure associated with the plunger reaching the bottom.
Abstract translation: 一种确定柱塞到达装有柱塞提升系统的油或气的底部的方法。 更具体地,该方法识别与柱塞到达底部相关联的表面压力。
-