-
公开(公告)号:US20210245607A1
公开(公告)日:2021-08-12
申请号:US16787629
申请日:2020-02-11
Applicant: Caterpillar Inc.
Inventor: Yanchai ZHANG , Baoyang DENG , Michael A. SNOPKO , Theodore E. WIERSEMA
Abstract: A control system implementing a hybrid energy storage system (ESS) optimization strategy is disclosed. The hybrid ESS optimization strategy may be implemented in a machine that comprises a power system that includes a plurality of power sources and a power controller that includes one or more processors. The power controller may receive information related to a set of brake-specific fuel consumption (BSFC) maps associated with the plurality of power sources, determine a performance indicator using a cost function associated with the plurality of power sources, and generate a command to operate the power system based on a power distribution that minimizes an energy cost to operate the power system based on the information related to the set of BSFC maps, the performance indicator, and a load associated with the power system.
-
公开(公告)号:US20230163593A1
公开(公告)日:2023-05-25
申请号:US17455865
申请日:2021-11-19
Applicant: Caterpillar Inc.
Inventor: Yanchai ZHANG , Syed Ameenuddin HUSSAIN , Baoyang DENG , Zhijun CAI , Shiferaw D. BEYENE , Casey Alan OTTEN , Perry CONVERSE , Theodore E. WIERSEMA , Michael A. SNOPKO
Abstract: A system may determine configuration information associated with a power system for a work site that includes one or more power sources. The system may determine respective operation parameters of the one or more power sources and one or more performance criteria associated with the power system. The system may determine a baseline operation plan for the power system. The system may identify an optimization analysis technique and may process, using the optimization analysis technique, the configuration information associated with the power system, the respective operation parameters of the one or more power sources, and the one or more performance criteria associated with the power system to generate the optimized operation plan for the power system. The system may cause, based on the baseline operation plan for the power system and the optimized operation plan for the power system, one or more actions to be performed.
-