-
公开(公告)号:US07127314B2
公开(公告)日:2006-10-24
申请号:US10811087
申请日:2004-03-25
Applicant: Chin-Cheng Pan , Chao-Fan Chang , Pai-Cheng Huang , Oliver Wu
Inventor: Chin-Cheng Pan , Chao-Fan Chang , Pai-Cheng Huang , Oliver Wu
IPC: G06F19/00
CPC classification number: H01L21/67276
Abstract: System and method for monitoring a fabrication process. Generally, an actual-to-planned variance is calculated by determining a daily part index as a percentage of the delta between the planned quantity and the actual quantity over the planned quantity. A weekly part index is calculated by averaging the daily part index over a predetermined time period. From the weekly part index, a site index is determined that takes into account products fabricated at a particular site. Furthermore, a planned-to-actual variance may be calculated by determining a daily part index as a percentage of the delta between the planned quantity and the actual quantity over the actual quantity. A weekly part index is calculated by averaging the daily part index over a predetermined time period. From the weekly part index, a site index is determined that takes into account products fabricated at a particular site.
Abstract translation: 用于监控制造过程的系统和方法。 一般来说,实际计划的差异是通过将每日零件指数作为计划数量和实际数量之间的增量百分比来计算的。 通过在预定时间段内平均每日零件指数来计算每周零件指数。 从每周零件指数来看,确定了一个考虑到在特定场地制造的产品的站点索引。 此外,可以通过将每日零件指数确定为实际数量之间的计划数量和实际数量之间的差值的百分比来计算计划实际差异。 通过在预定时间段内平均每日零件指数来计算每周零件指数。 从每周零件指数来看,确定了一个考虑到在特定场地制造的产品的站点索引。
-
公开(公告)号:US5931427A
公开(公告)日:1999-08-03
申请号:US998683
申请日:1997-12-29
Applicant: Chin-Cheng Pan
Inventor: Chin-Cheng Pan
CPC classification number: A47K10/10 , A47K2201/00
Abstract: A bathroom rack is composed of at least one U-shaped fastening piece, two connection heads, and one block body which is held by the U-shaped fastening piece. Two arms of the U-shaped fastening piece are held by the connection heads which are fastened onto the bathroom wall. The block body is versatile in form and is held by the fastening piece such that the bathroom rack may be used for various purposes.
Abstract translation: 浴室架由至少一个U形紧固件,两个连接头和由U形紧固件固定的一个块体组成。 U形紧固件的两个臂由连接头固定在浴室壁上。 块体在形式上是通用的,并且由紧固件保持,使得浴室架可用于各种目的。
-
公开(公告)号:US20050216113A1
公开(公告)日:2005-09-29
申请号:US10811087
申请日:2004-03-25
Applicant: Chin-Cheng Pan , Chao-Fan Chang , Pai-Cheng Huang , Oliver Wu
Inventor: Chin-Cheng Pan , Chao-Fan Chang , Pai-Cheng Huang , Oliver Wu
CPC classification number: H01L21/67276
Abstract: System and method for monitoring a fabrication process. Generally, an actual-to-planned variance is calculated by determining a daily part index as a percentage of the delta between the planned quantity and the actual quantity over the planned quantity. A weekly part index is calculated by averaging the daily part index over a predetermined time period. From the weekly part index, a site index is determined that takes into account products fabricated at a particular site. Furthermore, a planned-to-actual variance may be calculated by determining a daily part index as a percentage of the delta between the planned quantity and the actual quantity over the actual quantity. A weekly part index is calculated by averaging the daily part index over a predetermined time period. From the weekly part index, a site index is determined that takes into account products fabricated at a particular site.
Abstract translation: 用于监控制造过程的系统和方法。 一般来说,实际计划的差异是通过将每日零件指数作为计划数量和实际数量之间的增量百分比来计算的。 通过在预定时间段内平均每日零件指数来计算每周零件指数。 从每周零件指数来看,确定了一个考虑到在特定场地制造的产品的站点索引。 此外,可以通过将每日零件指数确定为实际数量之间的计划数量和实际数量之间的差值的百分比来计算计划实际差异。 通过在预定时间段内平均每日零件指数来计算每周零件指数。 从每周零件指数来看,确定了一个考虑到在特定场地制造的产品的站点索引。
-
-