Method and System for Dynamic Project Management and Capacity Management and capacity management
    1.
    发明申请
    Method and System for Dynamic Project Management and Capacity Management and capacity management 有权
    动态项目管理和能力管理与能力管理方法与系统

    公开(公告)号:US20100076803A1

    公开(公告)日:2010-03-25

    申请号:US12236152

    申请日:2008-09-23

    IPC分类号: G06Q10/00 G06F17/30

    摘要: Described herein are systems and methods for dynamic project management and capacity management. Specifically, the systems and method include a management tool for performing project management, capacity management, and time and cost creation across systems and departments for the lowest levels of data. The management tool include a computer readable storage medium including a set of instructions that are executable by a processor, the set of instructions being operable to store projected time information and projected cost information for a project, store actual time information and actual cost information for the project, and display a correlation between i) the projected time information and actual time information, and ii) the projected cost information and the actual cost information.

    摘要翻译: 这里描述了动态项目管理和容量管理的系统和方法。 具体来说,系统和方法包括一个管理工具,用于在最低级别的数据中执行项目管理,容量管理以及跨系统和部门的时间和成本创建。 管理工具包括计算机可读存储介质,其包括可由处理器执行的一组指令,该组指令可操作以存储项目的预计时间信息和预计成本信息,存储实际时间信息和实际成本信息 项目,并显示i)预计时间信息和实际时间信息之间的相关性,以及ii)预计成本信息和实际成本信息。

    Method and system for dynamic project management and capacity management
    2.
    发明授权
    Method and system for dynamic project management and capacity management 有权
    动态项目管理和能力管理的方法和系统

    公开(公告)号:US08370192B2

    公开(公告)日:2013-02-05

    申请号:US12236152

    申请日:2008-09-23

    IPC分类号: G06Q10/00

    摘要: Described herein are systems and methods for dynamic project management and capacity management. Specifically, the systems and method include a management tool for performing project management, capacity management, and time and cost creation across systems and departments for the lowest levels of data. The management tool include a computer readable storage medium including a set of instructions that are executable by a processor, the set of instructions being operable to store projected time information and projected cost information for a project, store actual time information and actual cost information for the project, and display a correlation between i) the projected time information and actual time information, and ii) the projected cost information and the actual cost information.

    摘要翻译: 这里描述了动态项目管理和容量管理的系统和方法。 具体来说,系统和方法包括一个管理工具,用于在最低级别的数据中执行项目管理,容量管理以及跨系统和部门的时间和成本创建。 管理工具包括计算机可读存储介质,其包括可由处理器执行的一组指令,该组指令可操作以存储项目的预计时间信息和预计成本信息,存储实际时间信息和实际成本信息 项目,并显示i)预计时间信息和实际时间信息之间的相关性,以及ii)预计成本信息和实际成本信息。