-
1.
公开(公告)号:US20240045715A1
公开(公告)日:2024-02-08
申请号:US18229615
申请日:2023-08-02
Applicant: Cisco Technology, Inc.
Inventor: Rohit Bahl , Stephen Williams , Debashish Ghosh
CPC classification number: G06F9/4881 , G06F9/5038 , G06N3/126 , G06N3/086
Abstract: Various techniques are used to schedule computing jobs for execution by a computing resource. In an example method, a schedule is generated by selecting, for a first slot in the schedule, a first computing job based on a first priority of the first computing job with respect to a first characteristic. A second computing job is selected for a second slot in the schedule based on a second priority of the second computing job with respect to a second characteristic. The second slot occurs after the first slot in the schedule, and the second characteristic is different than the first characteristic. The first characteristic or the second characteristic includes an execution frequency. The computing jobs are executed based on the schedule.
-
公开(公告)号:US10795724B2
公开(公告)日:2020-10-06
申请号:US15905847
申请日:2018-02-27
Applicant: Cisco Technology, Inc.
Inventor: Rohit Bahl , Debashish Ghosh , Stephen Williams
Abstract: In one embodiment, a system includes: a plurality of cloud nodes implemented on computing devices, the plurality of cloud nodes configured to execute computing jobs in a cloud computing environment according to a schedule, a schedule optimizer configured to: use a machine learning model to determine functional intent for job requests according to at least job execution metadata, and generate a schedule recommendation for jobs associated with the job requests, where the schedule recommendation is generated based at least in part on the functional intent; and a job executor configured to provide the schedule recommendation as the schedule to the plurality of cloud nodes, where the schedule optimizer and the job executor are instantiated in memory and executed by processing circuitry on at least one computing device.
-
3.
公开(公告)号:US12079660B2
公开(公告)日:2024-09-03
申请号:US18229615
申请日:2023-08-02
Applicant: Cisco Technology, Inc.
Inventor: Rohit Bahl , Stephen Williams , Debashish Ghosh
CPC classification number: G06F9/4881 , G06F9/5038 , G06N3/126 , G06F9/4887 , G06N3/086 , G06N3/12
Abstract: Various techniques are used to schedule computing jobs for execution by a computing resource. In an example method, a schedule is generated by selecting, for a first slot in the schedule, a first computing job based on a first priority of the first computing job with respect to a first characteristic. A second computing job is selected for a second slot in the schedule based on a second priority of the second computing job with respect to a second characteristic. The second slot occurs after the first slot in the schedule, and the second characteristic is different than the first characteristic. The first characteristic or the second characteristic includes an execution frequency. The computing jobs are executed based on the schedule.
-
4.
公开(公告)号:US11734062B2
公开(公告)日:2023-08-22
申请号:US17105422
申请日:2020-11-25
Applicant: Cisco Technology, Inc.
Inventor: Rohit Bahl , Stephen Williams , Debashish Ghosh
CPC classification number: G06F9/4881 , G06F9/5038 , G06N3/126 , G06F9/4887 , G06N3/086 , G06N3/12
Abstract: Various techniques are used to schedule computing jobs for execution by a computing resource. In an example method, a schedule is generated by selecting, for a first slot in the schedule, a first computing job based on a first priority of the first computing job with respect to a first characteristic. A second computing job is selected for a second slot in the schedule based on a second priority of the second computing job with respect to a second characteristic. The second slot occurs after the first slot in the schedule, and the second characteristic is different than the first characteristic. The first characteristic or the second characteristic includes an execution frequency. The computing jobs are executed based on the schedule.
-
5.
公开(公告)号:US20210081240A1
公开(公告)日:2021-03-18
申请号:US17105422
申请日:2020-11-25
Applicant: Cisco Technology, Inc.
Inventor: Rohit Bahl , Stephen Williams , Debashish Ghosh
Abstract: Various techniques are used to schedule computing jobs for execution by a computing resource. In an example method, a schedule is generated by selecting, for a first slot in the schedule, a first computing job based on a first priority of the first computing job with respect to a first characteristic. A second computing job is selected for a second slot in the schedule based on a second priority of the second computing job with respect to a second characteristic. The second slot occurs after the first slot in the schedule, and the second characteristic is different than the first characteristic. The first characteristic or the second characteristic includes an execution frequency. The computing jobs are executed based on the schedule.
-
-
-
-