-
公开(公告)号:US11916266B2
公开(公告)日:2024-02-27
申请号:US17212434
申请日:2021-03-25
Applicant: ENEOS Corporation
Inventor: Akihiko Fukunaga , Toshio Tezuka , Tadashi Seike , Hirofumi Nishio , Daisaku Tateishi
IPC: H01M8/04089 , C01B3/32 , H01M8/04082 , H01M8/0606 , B60S5/02 , B60L50/70
CPC classification number: H01M8/04089 , B60S5/02 , C01B3/32 , H01M8/04201 , H01M8/0606 , B60L50/70 , C01B2203/1604 , C01B2203/1609 , H01M2250/20 , Y02T90/40
Abstract: An operation method is provided for a hydrogen production apparatus that is disposed in a hydrogen station and produces hydrogen gas to be supplied to a fuel cell vehicle (FCV) arriving at the hydrogen station. The operation method includes starting up a hydrogen production apparatus up to a first operation load ratio preset for a rated operation. The operation method includes increasing an operation load of the hydrogen production apparatus to a second operation load ratio, which is larger than the first operation load ratio, at first timing associated with an arrival of the FCV, and decreasing the operation load of the hydrogen production apparatus to a third operation load ratio, which is smaller than the second operation load ratio, at second timing associated with a completion of hydrogen filling into the FCV.
-
公开(公告)号:US12148961B2
公开(公告)日:2024-11-19
申请号:US18527824
申请日:2023-12-04
Applicant: ENEOS CORPORATION
Inventor: Akihiko Fukunaga , Toshio Tezuka , Tadashi Seike , Hirofumi Nishio , Daisaku Tateishi
IPC: H01M8/04089 , B60L50/70 , B60S5/02 , C01B3/32 , H01M8/04082 , H01M8/0606
Abstract: A hydrogen production supply system that produces hydrogen gas to be supplied to a hydrogen storage tank, the hydrogen production supply system including a control circuit configured to control an operation load ratio of the hydrogen production apparatus to a predetermined operation load ratio, to increase the operation load ratio of the hydrogen production apparatus to a first operation load ratio larger than the predetermined operation load ratio at first timing, and to decrease the operation load ratio of the hydrogen production apparatus to the predetermined operation load ratio from the first load operation ratio at second timing, wherein an increase in the operation load ratio at the first timing takes precedence over a decrease in the operation load ratio at the second timing.
-
公开(公告)号:US11754226B2
公开(公告)日:2023-09-12
申请号:US17017132
申请日:2020-09-10
Applicant: ENEOS Corporation
Inventor: Akihiko Fukunaga , Toshio Tezuka , Tatsuya Rembutsu , Kouki Sakamoto
CPC classification number: F17C5/06 , B67D7/04 , F17C2221/012 , F17C2223/0123 , F17C2227/0157 , F17C2250/032 , F17C2250/0443 , F17C2265/065
Abstract: According to one aspect of the present invention, a hydrogen fuel filling system includes a first flow passage through which hydrogen fuel supplied from a pressure accumulator that accumulates hydrogen fuel under pressure passes; a second flow passage through which hydrogen fuel supplied from the pressure accumulator passes, and which is arranged in parallel with the first flow passage; a switching valve that switches flow passages selectively from one of the first and second flow passages to another, or that switches flow passages between one and both of the first and second flow passages; and a control circuit that controls opening/closing of the switching valve, wherein a fuel cell vehicle using hydrogen fuel as a power source is filled with hydrogen fuel while switching the flow passages by the switching valve during supply from the pressure accumulator.
-
4.
公开(公告)号:US11920733B2
公开(公告)日:2024-03-05
申请号:US17097439
申请日:2020-11-13
Applicant: ENEOS Corporation
Inventor: Toshio Tezuka , Tatsuya Rembutsu , Koki Sakamoto
CPC classification number: F17C13/025 , B60K15/03006 , F17C13/026 , F17C13/028 , G01F25/15 , B60K2015/03203 , B60K2015/03315 , F17C2223/0123 , F17C2250/0443
Abstract: According to one aspect of the present invention, a method for diagnosing a failure of a flowmeter in a measuring machine, includes calculating a filling amount at an end of filling of the hydrogen gas into a tank from the measuring machine by using a pressure, a temperature, and a volume of the tank; and determining whether or not the flowmeter fails by using a plurality of error values between a metering filling amount at the end of filling measured using the flowmeter and a calculated filling amount at the end of filling calculated using the pressure, the temperature, and the volume of the tank, the plurality of error values being based on a plurality of past performance data stored in a storage device, and an error value at the end of filling of the hydrogen gas at a present time, and outputting a result.
-
公开(公告)号:US11754227B2
公开(公告)日:2023-09-12
申请号:US17049172
申请日:2019-04-26
Applicant: ENEOS CORPORATION
Inventor: Tatsuya Rembutsu , Akihiko Fukunaga , Toshio Tezuka , Eiji Negishi
CPC classification number: F17C5/06 , F17C13/025 , F17C2221/012 , F17C2250/043 , F17C2265/065
Abstract: A control device of a gas charging device controls opening/closing of a control valve so that pressure increase rate of gas pressure in a tank when gas charging to the tank increases at a reference increase rate determined in advance. The control device, when gas charge to the tank begins, controls pressure increase rate at a high increase rate higher than the reference increase rate. After the difference between gas pressure in the tank when gas charging is performed at the high increase rate and gas pressure in the tank when the charging is performed at the reference increase rate has reached a predetermined pressure difference, the control device controls the opening/closing of the control valve so that gas charge to the tank is performed at the reference increase rate.
-
-
-
-