Abstract:
In order to predict power consumption, previous measurements, which indicate the actual amount of power consumed in the past, and errors between previous estimates and the previous measurements, are used as first input data, and power consumption estimates for each prediction technique are simultaneously calculated by using the first input data in at least two prediction techniques. Next, the power consumption estimates calculated by each prediction technique and errors between the power consumption estimates and an actual measurement are used as second input data, and the final power consumption is predicted by making an additional power consumption prediction based on the second input data.
Abstract:
In a light-installed area where a plurality of lights are installed, a light managing system senses a moving object that enters the light-installed area and predicts an predicted stop position of the moving object based on record information on a channel of movement corresponding to identification information on the moving object. The light managing system calculates a predicted channel of movement of the moving object based on the predicted stop position, and selects lights to be driven based on the calculated predicted channel of movement. The light managing system turns on the selected lights.