MANDREL CONVEYING DEVICE FOR A TUBE ROLLING MILL
    1.
    发明申请
    MANDREL CONVEYING DEVICE FOR A TUBE ROLLING MILL 有权
    用于管道轧制机的MANDREL输送装置

    公开(公告)号:US20130008219A1

    公开(公告)日:2013-01-10

    申请号:US13438107

    申请日:2012-04-03

    CPC classification number: B21B17/02 B21B17/04 B21B25/02 B21C45/00

    Abstract: A rolling plant (R) for rolling tubes having a multi-stand rolling mill (5) with two or more rolls, in order to implement a controlled speed mandrel rolling process, comprises a hooking and releasing device (61) which is arranged in the inlet area of the rolling mill (5) to cooperate with the rear tang of the mandrel (31) and a hooking and releasing device (71) which is arranged in the outlet area of the rolling mill (5) to cooperate with the front tang of the mandrel (31) in coordinated manner with the first hooking and releasing device (61).

    Abstract translation: 为了实现受控速度的心轴轧制过程,为了实现受控速度的心轴轧制过程,具有具有两个或更多个轧辊的多台轧机(5)的轧制管轧机(R)包括一个挂钩和释放装置(61) 轧制机(5)的入口区域与心轴(31)的后柄部配合,以及配置在轧机(5)的出口区域中以与前刀柄配合的钩卸装置(71) 与第一钩挂释放装置(61)协调地形成心轴(31)。

    Mandrel conveying device for a tube rolling mill
    2.
    发明授权
    Mandrel conveying device for a tube rolling mill 有权
    管轧机心轴输送装置

    公开(公告)号:US09205473B2

    公开(公告)日:2015-12-08

    申请号:US13438107

    申请日:2012-04-03

    CPC classification number: B21B17/02 B21B17/04 B21B25/02 B21C45/00

    Abstract: A rolling plant (R) for rolling tubes having a multi-stand rolling mill (5) with two or more rolls, in order to implement a controlled speed mandrel rolling process, comprises a hooking and releasing device (61) which is arranged in the inlet area of the rolling mill (5) to cooperate with the rear tang of the mandrel (31) and a hooking and releasing device (71) which is arranged in the outlet area of the rolling mill (5) to cooperate with the front tang of the mandrel (31) in coordinated manner with the first hooking and releasing device (61).

    Abstract translation: 为了实现受控速度的心轴轧制过程,为了实现受控速度的心轴轧制过程,具有具有两个或更多个轧辊的多台轧机(5)的轧制管轧机(R)包括一个挂钩和释放装置(61) 轧制机(5)的入口区域与心轴(31)的后柄部配合,以及配置在轧机(5)的出口区域中以与前刀柄配合的钩卸装置(71) 与第一钩挂释放装置(61)协调地形成心轴(31)。

    Process for rolling tubes in a continuous multi-stand rolling mill
    3.
    发明授权
    Process for rolling tubes in a continuous multi-stand rolling mill 有权
    在连续多台轧机中轧制管的方法

    公开(公告)号:US09283599B2

    公开(公告)日:2016-03-15

    申请号:US13416016

    申请日:2012-03-09

    CPC classification number: B21B17/04 B21B25/02

    Abstract: A tube rolling plant (R) with multi-stand rolling mill having two or more rollers, for implementing a mandrel rolling process with controlled speed has a mandrel (31) which is inserted into the hollow body (39) from the frontal opening thereof by passing it first through the rolling mill (5). An opposite movement (L3) with respect to the rolling direction is imparted to the mandrel (31) by way of the hooking device (61) when rolling the hollow body (39) and the rear end of the rolled tube (42) is extracted at the end of the rolling operation.

    Abstract translation: 具有两个或更多个辊的多台轧机的轧制设备(R)具有控制速度的芯棒轧制过程,具有从其前侧开口插入中空体(39)的芯棒(31) 首先通过轧机(5)。 当滚动中空体(39)时,通过钩装置(61)向心轴(31)施加相对于轧制方向的相对运动(L3),并且提取出轧制管(42)的后端 在滚动操作结束时。

    PROCESS FOR ROLLING TUBES IN A CONTINUOUS MULTI-STAND ROLLING MILL
    4.
    发明申请
    PROCESS FOR ROLLING TUBES IN A CONTINUOUS MULTI-STAND ROLLING MILL 有权
    在连续多台轧机中轧制管的工艺

    公开(公告)号:US20130061646A1

    公开(公告)日:2013-03-14

    申请号:US13416016

    申请日:2012-03-09

    CPC classification number: B21B17/04 B21B25/02

    Abstract: A tube rolling plant (R) with multi-stand rolling mill having two or more rollers, for implementing a mandrel rolling process with controlled speed has a mandrel (31) which is inserted into the hollow body (39) from the frontal opening thereof by passing it first through the rolling mill (5). An opposite movement (L3) with respect to the rolling direction is imparted to the mandrel (31) by means of the hooking device (61) when rolling the hollow body (39) and the rear end of the rolled tube (42) is extracted at the end of the rolling operation.

    Abstract translation: 具有两个或更多个辊的多台轧机的轧制设备(R)具有控制速度的芯棒轧制过程,具有从其前侧开口插入中空体(39)的芯棒(31) 首先通过轧机(5)。 在滚动中空体(39)时,相对于滚动方向的相对移动(L3)通过钩装置(61)被施加到心轴(31),并且轧制管(42)的后端被抽出 在滚动操作结束时。

Patent Agency Ranking