Railroad brake pipe overcharge and separation detection system
    1.
    发明授权
    Railroad brake pipe overcharge and separation detection system 失效
    铁路制动管过充分离检测系统

    公开(公告)号:US06375275B1

    公开(公告)日:2002-04-23

    申请号:US09475821

    申请日:1999-12-30

    IPC分类号: B60T1368

    CPC分类号: B60T17/228 B60T13/665

    摘要: A brake pipe overcharge detection scheme determines when an overcharge situation occurs followed by an interruption of the brake pipe slow pressure reduction process of the brake system assimilation. When the slow pressure reduction process is interrupted, the rail cars may be left in an overcharged state (i.e., the car braking system is charged to a pressure greater than the normal brake pipe pressure). When the brake pipe pressure is set to its normal brake-release value, the pressure of the car braking systems will be greater than the brake pipe pressure. The car braking system will interpret this positive pressure differential as a request to set the car brakes, and will therefore partially apply the car brakes. As a result, additional drag forces will be encountered by the locomotive as it moves the train, which may result in train separations, and overheating of the car brake shoes and wheels may result in cracked wheels and derailments.

    摘要翻译: 制动管过充电检测方案确定何时发生过充电情况,然后中止制动系统同步的制动管慢压减压过程。 当缓慢压力降低过程中断时,轨道车辆可能处于过充电状态(即,轿厢制动系统被充入大于正常制动管道压力的压力)。 当制动管压力设定为其正常制动释放值时,轿厢制动系统的压力将大于制动管压力。 汽车制动系统将将这种正压差解释为设置汽车制动器的要求,因此将部分应用汽车制动器。 结果,机车在移动火车时会遇到额外的拖曳力,这可能导致列车分离,并且汽车制动蹄和车轮的过热可能导致车轮破裂和脱轨。