-
公开(公告)号:US5015132A
公开(公告)日:1991-05-14
申请号:US523749
申请日:1990-05-15
IPC分类号: F16B31/02
CPC分类号: F16B31/028
摘要: A pre-load indicating washer in which a plurality of protuberances, struck and partially sheared from the annular body of the washer, are pushed under load back into a corresponding of indentations in the annular body which are formed when the protuberances are formed. The walls of the protuberances and the walls of the indentations are arranged so that when the protuberances are "collapsed" back into the indentations, there is minimal frictional resistance as the walls of the protuberances slide past the walls of the indentations.
摘要翻译: 一个预加载指示垫圈,其中多个从垫圈的环形体打磨并部分剪切的突起在负载下被推回到在形成突起时形成的环形体中的相应凹口中。 凸起的壁和压痕的壁布置成使得当突起“折叠”回到压痕中时,随着突起的壁滑过压痕的壁,存在最小的摩擦阻力。
-
公开(公告)号:US5487632A
公开(公告)日:1996-01-30
申请号:US262787
申请日:1994-06-20
申请人: A. Craig Hood , Lloyd J. Larson
发明人: A. Craig Hood , Lloyd J. Larson
CPC分类号: F16B31/028 , Y10S116/34
摘要: A pre-load indicating washer in which a plurality of protuberances, struck and partially sheared from the annular body of the washer, are pushed under load back into a corresponding plurality of indentations in the annular body which are formed when the protuberances are formed. The mass of material defined by each protuberance/indentation pair is concentrated along the lengthwise central region of the protuberance/indentation pair, thereby stiffening the protuberance, so that when load is applied to the washer, the protuberance will first undergo elastic deformation prior to collapsing back into the indentation from which it was formed.
摘要翻译: 一个预加载指示垫圈,其中从该垫圈的环形体打入并部分剪切的多个突起在负载下被推回到在形成突起时形成的环形体中相应的多个凹口中。 由每个突起/压痕对限定的材料质量沿着突起/压痕对的纵向中心区域集中,从而使凸起加强,使得当负载施加到垫圈时,突起将首先在塌陷之前进行弹性变形 回到它形成的缩进。
-
公开(公告)号:US5370483A
公开(公告)日:1994-12-06
申请号:US81636
申请日:1993-06-24
申请人: A. Craig Hood , Lloyd J. Larson
发明人: A. Craig Hood , Lloyd J. Larson
CPC分类号: F16B31/028 , Y10S116/34
摘要: A pre-load indicating washer in which a plurality of protuberances, struck and partially sheared from the annular body of the washer, are pushed under load back into a corresponding plurality of indentations in the annular body which are formed when the protuberances are formed. The mass of material defined by each protuberance/indentation pair is concentrated along the lengthwise central region of the protuberance/indentation pair, thereby stiffening the protuberance, so that when load is applied to the washer, the protuberance will first undergo elastic deformation prior to collapsing back into the indentation from which it was formed.
摘要翻译: 一个预加载指示垫圈,其中从该垫圈的环形体打入并部分剪切的多个突起在负载下被推回到在形成突起时形成的环形体中相应的多个凹口中。 由每个突起/压痕对限定的材料质量沿着突起/压痕对的纵向中心区域集中,从而使凸起加强,使得当负载施加到垫圈时,突起将首先在塌陷之前进行弹性变形 回到它形成的缩进。
-
-