A SUPPORT METHOD OF PRESET INTERNAL CABLE FOR IN-SITU TUNNEL EXPANSION RPOJECT

    公开(公告)号:US20230349293A1

    公开(公告)日:2023-11-02

    申请号:US17616647

    申请日:2021-10-14

    申请人: FUZHOU UNIVERSITY

    IPC分类号: E21D20/02 E21D21/00

    摘要: The present invention relates to a support method of preset internal cable for in-situ tunnel expansion project, comprising a cable, lockset and an anchoring agent, wherein before the excavation of the newly-built tunnel, a borehole is drilled into the surrounding rock from the in-situ tunnel, and the cable is installed in the borehole and pre-stressed, so as to play a supporting role at the moment of excavation of the newly-built tunnel. The cable is fixed in the depth of the surrounding rock by the anchoring agent, and the lockset of the cable is set at the position of the excavation contour line of the newly-built tunnel inside the surrounding rock. The present invention provides a method that does not interfere with the excavation construction and can effectively support the surrounding rock of the expanded tunnel in advance. It breaks through the “excavation first and then supports” model in the previous tunnel construction, and uses the space of the in-situ tunnel for pre-support, and by applying prestress, the deformation of surrounding rock can be controlled to the maximum extent.