-
1.
公开(公告)号:US20140305127A1
公开(公告)日:2014-10-16
申请号:US13859819
申请日:2013-04-10
Applicant: GENERAL ELECTRIC COMPANY
Inventor: Mark Stewart Schroder , Thomas Edward Wickert , Mark Allan Hadley
IPC: F02C3/04
Abstract: A system for augmenting gas turbine power output includes a compressed air supply, and a compressed air storage plenum in fluid communication with the compressed air supply. The compressed air storage plenum is configured to store a compressed air from the compressed air supply for later use. The system further includes an inlet plenum sealingly coupled to an inlet of the gas turbine. The inlet plenum is in fluid communication with the compressed air storage plenum so as to route the compressed air from the compressed air storage plenum into the inlet of the compressor during augmented operation of the gas turbine.
Abstract translation: 用于增加燃气轮机功率输出的系统包括压缩空气源和与压缩空气源流体连通的压缩空气存储增压室。 压缩空气储存室被构造成存储来自压缩空气供应源的压缩空气供以后使用。 该系统还包括密封地联接到燃气轮机的入口的入口增压室。 入口增压室与压缩空气存储增压室流体连通,以便在燃气轮机的增加操作期间将压缩空气从压缩空气储存室引导到压缩机的入口。
-
2.
公开(公告)号:US08984893B2
公开(公告)日:2015-03-24
申请号:US13859819
申请日:2013-04-10
Applicant: General Electric Company
Inventor: Mark Stewart Schroder , Thomas Edward Wickert , Mark Allan Hadley
Abstract: A system for augmenting gas turbine power output includes a compressed air supply, and a compressed air storage plenum in fluid communication with the compressed air supply. The compressed air storage plenum is configured to store a compressed air from the compressed air supply for later use. The system further includes an inlet plenum sealingly coupled to an inlet of the gas turbine. The inlet plenum is in fluid communication with the compressed air storage plenum so as to route the compressed air from the compressed air storage plenum into the inlet of the compressor during augmented operation of the gas turbine.
Abstract translation: 用于增加燃气轮机功率输出的系统包括压缩空气源和与压缩空气源流体连通的压缩空气存储增压室。 压缩空气储存室被构造成存储来自压缩空气供应源的压缩空气供以后使用。 该系统还包括密封地联接到燃气轮机的入口的入口增压室。 入口增压室与压缩空气存储增压室流体连通,以便在燃气轮机的增加操作期间将压缩空气从压缩空气储存室引导到压缩机的入口。
-
公开(公告)号:US11144972B2
公开(公告)日:2021-10-12
申请号:US15856116
申请日:2017-12-28
Applicant: General Electric Company
Abstract: A method relating to pricing under a contractual service agreement between a customer and a service provider, where the service provider provides maintenance services on a generating unit for a fee. An output of the generating unit is produced by a generator to which the generating unit is operably connected. The method comprising: determining a usage period for the generating unit; monitoring the output of the generating unit during the usage period and, therefrom, designating an output level for the generating unit for the usage period; calculating the fee for the usage period pursuant to a variable pricing plan, the variable pricing plan comprising a price for calculating the fee that varies depending on the designated output level of generating unit for the usage period; and billing the calculated fee to the customer.
-
4.
公开(公告)号:US20190205952A1
公开(公告)日:2019-07-04
申请号:US15856116
申请日:2017-12-28
Applicant: General Electric Company
CPC classification number: G06Q30/0283 , G06Q10/20 , G06Q30/0206 , G06Q30/04
Abstract: A method relating to pricing under a contractual service agreement between a customer and a service provider, where the service provider provides maintenance services on a generating unit for a fee. An output of the generating unit is produced by a generator to which the generating unit is operably connected. The method comprising: determining a usage period for the generating unit; monitoring the output of the generating unit during the usage period and, therefrom, designating an output level for the generating unit for the usage period; calculating the fee for the usage period pursuant to a variable pricing plan, the variable pricing plan comprising a price for calculating the fee that varies depending on the designated output level of generating unit for the usage period; and billing the calculated fee to the customer.
-
-
-